Prefabricated Steel Structure Budget-friendly Choice

prefabricated steel structure adopts standardized factory prefabrication and on-site bolt rapid assembly mode, which greatly shortens the project cycle and reduces the foundation cost, providing you with high-strength large-span flexible building solutions. Wedospace is the source manufacturer, eliminating the middleman link, supporting bulk procurement, providing you with highly competitive ex-factory prices and faster delivery speed.

Q345 high strength steel Material
maximum 180 meters Span range
up to 90 meters Width
unlimited extension on demand Maximum length
saving nearly 50% Construction time
hot galvanized antirust paint Surface treatment
up to 50 years Service life
prefabricated steel structure

gear

all steel components are accurately prefabricated and punched in the factory, and directly assembled by high-strength bolts after being transported to the site. Compared with traditional concrete buildings, it can shorten the on-site construction time by about half, helping your project to go into production quickly.

gear

the main steel frame adopts high-strength variable cross-section design, with a maximum span of 180 meters and no internal support columns. This design greatly improves the utilization rate of the internal space of the factory or warehouse, and facilitates the operation of large forklifts and assembly lines.

gear

Since the overall weight of steel is only a small 1 of traditional cast-in-place buildings, the foundation load-bearing requirements and foundation treatment costs are greatly reduced. Standardized factory mass production also greatly reduces material loss and on-site labor costs.

gear

the main body is made of high-quality carbon structural steel, combined with precise mechanical design, the seismic fortification intensity can reach up to 9 degrees. Multi-layer anti-rust primer and topcoat treatment effectively resist wet and corrosive environment, to ensure that the building structure is durable.

gear

the full bolted frame system gives a high degree of flexibility. When the enterprise needs to expand the scale of production in the future, it can quickly increase the span or extend the building structure only by removing part of the exterior wall panel, and the secondary transformation is extremely convenient.

gear

the assembly dry construction process reduces the vast majority of on-site wet work and dust pollution. When the building reaches its useful life or faces relocation, the recycling rate of steel structure main materials exceeds 85%, which meets modern environmental protection standards.

Parameter nameSpecifications
Main steel gradeQ235B or Q345B structural steel
Main frame connection methodHigh-strength bolt connection, no on-site welding required.
Maximum column-free spanUp to 180 meters
Wind resistance levelIt can withstand strong winds of level 12 to 14.
Seismic fortification intensity6 to 9 degrees
Corrosion and rust prevention treatmentTwo coats of alkyd anti-rust paint or overall hot-dip galvanizing.
Roof and wall enclosureColor steel roofing sheets or polyurethane fireproof and heat-insulating sandwich panels
Applicable ambient temperature-40 degrees Celsius to 60 degrees Celsius
Wedospace prefabricated steel structures are cut and welded by fully automated numerical control equipment to ensure that the dimensional accuracy of each 1 of main beams and columns reaches the millimeter level. Compared with the same type of steel structure with extensive processing on the market, the Wedospace components do not need any secondary cutting and polishing when they arrive at the site for assembly, which not only greatly improves the unity and installation accuracy of the overall structure, but also ensures the absolute stability of the frame under extreme stress conditions. At the same time, Wedospace product design attaches great importance to long-term corrosion and structural fire resistance. Compared with the ordinary steel plant is prone to rust and peeling in a few years, this product adopts multi-channel heavy anti-corrosion coating process, and its anti-rust ability is several times that of ordinary products, which greatly reduces the long-term maintenance cost and ensures the maximization of investment benefits.
prefabricated steel structure

solution

Wedospace prefabricated steel structure

in view of the problem that the traditional cast-in-place building has a long construction period and is greatly affected by extreme weather, we realize all-weather and unimpeded construction through full prefabrication in the factory and on-site dry assembly, thus helping you to withdraw funds in advance.
solution

Wedospace prefabricated steel structure

in view of the problem of high structural rework rate caused by large welding errors on site, we completed numerical control drilling and node pre-assembly in the factory, realized full bolt connection on site, and completely eliminated the hidden danger of assembly dislocation.
solution

Wedospace prefabricated steel structures

In response to difficult and costly plant expansion, our modular bolted design supports non-destructive disassembly and rapid splicing of components, making scale expansion more flexible and convenient.

Industrial Manufacturing Plant Developer

Suitable for heavy and light manufacturing enterprises that require large areas of barrier-free interior space. The large span provided by the prefabricated frame is convenient for the flexible arrangement of heavy machinery, driving and assembly lines, which perfectly meets the strict load and space requirements of various industrial production.

prefabricated steel structure Target audience

Large warehouse logistics operators

For businesses that need to quickly set up large storage space. The extremely short construction cycle allows the logistics distribution center to be quickly put into commercial operation, and the highly flexible internal space is very suitable for building multi-layer high-level shelves and wide heavy forklift operating channels.

prefabricated steel structure Target audience

Commercial Complex and Public Facilities Investors

Suitable for the construction of large supermarkets, exhibition centers or indoor sports venues. The lightweight prefabricated structure not only significantly reduces the cost of deep foundation pit foundation, but also easily realizes the complex and modern architectural appearance design, which perfectly takes into account the beauty and strong practicability.

prefabricated steel structure Target audience

International Project Contracting and Trade Intermediary

For construction service providers who undertake the general contracting business of overseas projects. The modular design allows all beam and column components to be standardized and packed into standard containers, which greatly reduces the cost of cross-border shipping, and only requires bolt assembly on site, with very low technical requirements for local workers.

prefabricated steel structure Target audience
011

Before pouring the foundation concrete, use a special steel mold to accurately locate the position of the anchor bolts. After concrete pouring and curing, the elevation and axis center point must be carefully re-measured to ensure that the error is strictly controlled within 5mm so as to facilitate the alignment of subsequent columns.

022

Use a heavy crane to lift the steel column smoothly, accurately align with the anchor bolt holes and fix the temporary spacers. Then the main beam members are hoisted in turn, and the high-strength bolts are used for preliminary connection, and the verticality correction is carried out with the theodolite.

033

After the main frame is fully aligned and locked, cross bracing between columns and roof horizontal braces are installed in turn. Subsequently, the roof and wall purlins are fixed with bolts to completely form a multi-dimensional force, stable and wind-resistant overall load-bearing skeleton.

044

From the bottom of the building from the bottom of the laying of external wall insulation board, and then complete the roof panel lap installation. All plate joints shall be sealed with high-quality weather-resistant adhesive, and rain-proof edge wrapping angle and drainage gutter system shall be installed in accordance with the specifications.

certificate

factory

Welcome to our Frequently Asked Questions page. We have compiled answers to common questions you may have, hoping to provide you with clear and quick solutions. If you cannot find the information you need here, please feel free to contact our customer support team.

How long is the overall service life of the prefabricated steel structure?
After professional anti-corrosion and anti-rust coating treatment of prefabricated steel structure, under normal environmental conditions and regular routine maintenance, its safe service life can easily reach fifty years or even longer.
How is the wind and seismic performance of this light steel structure building?
The structure adopts high-strength alloy steel with strict scientific support system. The designed wind resistance can resist typhoons of grade 12 or above, the seismic fortification intensity can reach up to 9 degrees, and the safety is extremely high.
How long does it take to install the 1 standard prefabricated industrial warehouse?
Compared with traditional reinforced concrete buildings, the overall construction period can be shortened by 30% to 50%. 1 10,000 square meters of standard plant usually only takes a few weeks to two or 3 months to complete the main installation.
If the factory needs to expand its capacity in the future, is it convenient to operate?
Very convenient. Since all components are connected by standardized bolts, new steel frames can be seamlessly assembled by removing only the wall panels that need to be extended on one side, achieving low-cost and rapid expansion without affecting production.
Can the thermal insulation and heat insulation effect of prefabricated steel structure meet the requirements of cold areas in the north?
The effect is excellent. The walls and roofs of buildings are usually matched with high-density rock wool, glass fiber wool or polyurethane sandwich panels, which can effectively block heat exchange and meet the world's extremely strict energy-saving and thermal insulation standards.
Will steel components rust when transported by sea or placed on the construction site?
It won't. All factory structural parts have been painted with two primers and two topcoats in the constant temperature workshop, or directly used hot-dip galvanizing treatment, which can effectively cope with the erosion of long-distance transportation and complex open air environment.
E-mail*
Number
Country
Name
Your Question
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

prefabricated steel structure

prefabricated steel structure adopts standardized factory prefabrication and on-site bolt rapid assembly mode, which greatly shortens the project cycle and reduces the foundation cost, providing you with high-strength large-span flexible building solutions. Wedospace is the source manufacturer, eliminating the middleman link, supporting bulk procurement, providing you with highly competitive ex-factory prices and faster delivery speed.

prefabricated steel structure

gear

all steel components are accurately prefabricated and punched in the factory, and directly assembled by high-strength bolts after being transported to the site. Compared with traditional concrete buildings, it can shorten the on-site construction time by about half, helping your project to go into production quickly.

gear

the main steel frame adopts high-strength variable cross-section design, with a maximum span of 180 meters and no internal support columns. This design greatly improves the utilization rate of the internal space of the factory or warehouse, and facilitates the operation of large forklifts and assembly lines.

gear

Since the overall weight of steel is only a small 1 of traditional cast-in-place buildings, the foundation load-bearing requirements and foundation treatment costs are greatly reduced. Standardized factory mass production also greatly reduces material loss and on-site labor costs.

gear

the main body is made of high-quality carbon structural steel, combined with precise mechanical design, the seismic fortification intensity can reach up to 9 degrees. Multi-layer anti-rust primer and topcoat treatment effectively resist wet and corrosive environment, to ensure that the building structure is durable.

gear

the full bolted frame system gives a high degree of flexibility. When the enterprise needs to expand the scale of production in the future, it can quickly increase the span or extend the building structure only by removing part of the exterior wall panel, and the secondary transformation is extremely convenient.

gear

the assembly dry construction process reduces the vast majority of on-site wet work and dust pollution. When the building reaches its useful life or faces relocation, the recycling rate of steel structure main materials exceeds 85%, which meets modern environmental protection standards.

Parameter nameSpecifications
Main steel gradeQ235B or Q345B structural steel
Main frame connection methodHigh-strength bolt connection, no on-site welding required.
Maximum column-free spanUp to 180 meters
Wind resistance levelIt can withstand strong winds of level 12 to 14.
Seismic fortification intensity6 to 9 degrees
Corrosion and rust prevention treatmentTwo coats of alkyd anti-rust paint or overall hot-dip galvanizing.
Roof and wall enclosureColor steel roofing sheets or polyurethane fireproof and heat-insulating sandwich panels
Applicable ambient temperature-40 degrees Celsius to 60 degrees Celsius

prefabricated steel structure contrast point

prefabricated steel structure
solution
Wedospace prefabricated steel structure
in view of the problem that the traditional cast-in-place building has a long construction period and is greatly affected by extreme weather, we realize all-weather and unimpeded construction through full prefabrication in the factory and on-site dry assembly, thus helping you to withdraw funds in advance.
solution
Wedospace prefabricated steel structure
in view of the problem of high structural rework rate caused by large welding errors on site, we completed numerical control drilling and node pre-assembly in the factory, realized full bolt connection on site, and completely eliminated the hidden danger of assembly dislocation.
solution
Wedospace prefabricated steel structures
In response to difficult and costly plant expansion, our modular bolted design supports non-destructive disassembly and rapid splicing of components, making scale expansion more flexible and convenient.

Industrial Manufacturing Plant Developer

Suitable for heavy and light manufacturing enterprises that require large areas of barrier-free interior space. The large span provided by the prefabricated frame is convenient for the flexible arrangement of heavy machinery, driving and assembly lines, which perfectly meets the strict load and space requirements of various industrial production.

prefabricated steel structure Target audience

Large warehouse logistics operators

For businesses that need to quickly set up large storage space. The extremely short construction cycle allows the logistics distribution center to be quickly put into commercial operation, and the highly flexible internal space is very suitable for building multi-layer high-level shelves and wide heavy forklift operating channels.

prefabricated steel structure Target audience

Commercial Complex and Public Facilities Investors

Suitable for the construction of large supermarkets, exhibition centers or indoor sports venues. The lightweight prefabricated structure not only significantly reduces the cost of deep foundation pit foundation, but also easily realizes the complex and modern architectural appearance design, which perfectly takes into account the beauty and strong practicability.

prefabricated steel structure Target audience

International Project Contracting and Trade Intermediary

For construction service providers who undertake the general contracting business of overseas projects. The modular design allows all beam and column components to be standardized and packed into standard containers, which greatly reduces the cost of cross-border shipping, and only requires bolt assembly on site, with very low technical requirements for local workers.

prefabricated steel structure Target audience
011

Before pouring the foundation concrete, use a special steel mold to accurately locate the position of the anchor bolts. After concrete pouring and curing, the elevation and axis center point must be carefully re-measured to ensure that the error is strictly controlled within 5mm so as to facilitate the alignment of subsequent columns.

022

Use a heavy crane to lift the steel column smoothly, accurately align with the anchor bolt holes and fix the temporary spacers. Then the main beam members are hoisted in turn, and the high-strength bolts are used for preliminary connection, and the verticality correction is carried out with the theodolite.

033

After the main frame is fully aligned and locked, cross bracing between columns and roof horizontal braces are installed in turn. Subsequently, the roof and wall purlins are fixed with bolts to completely form a multi-dimensional force, stable and wind-resistant overall load-bearing skeleton.

044

From the bottom of the building from the bottom of the laying of external wall insulation board, and then complete the roof panel lap installation. All plate joints shall be sealed with high-quality weather-resistant adhesive, and rain-proof edge wrapping angle and drainage gutter system shall be installed in accordance with the specifications.

Know Us and Contact Us

*
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!
FAQ

FAQ

How long is the overall service life of the prefabricated steel structure?
After professional anti-corrosion and anti-rust coating treatment of prefabricated steel structure, under normal environmental conditions and regular routine maintenance, its safe service life can easily reach fifty years or even longer.
How is the wind and seismic performance of this light steel structure building?
The structure adopts high-strength alloy steel with strict scientific support system. The designed wind resistance can resist typhoons of grade 12 or above, the seismic fortification intensity can reach up to 9 degrees, and the safety is extremely high.
How long does it take to install the 1 standard prefabricated industrial warehouse?
Compared with traditional reinforced concrete buildings, the overall construction period can be shortened by 30% to 50%. 1 10,000 square meters of standard plant usually only takes a few weeks to two or 3 months to complete the main installation.
If the factory needs to expand its capacity in the future, is it convenient to operate?
Very convenient. Since all components are connected by standardized bolts, new steel frames can be seamlessly assembled by removing only the wall panels that need to be extended on one side, achieving low-cost and rapid expansion without affecting production.
Can the thermal insulation and heat insulation effect of prefabricated steel structure meet the requirements of cold areas in the north?
The effect is excellent. The walls and roofs of buildings are usually matched with high-density rock wool, glass fiber wool or polyurethane sandwich panels, which can effectively block heat exchange and meet the world's extremely strict energy-saving and thermal insulation standards.
Will steel components rust when transported by sea or placed on the construction site?
It won't. All factory structural parts have been painted with two primers and two topcoats in the constant temperature workshop, or directly used hot-dip galvanizing treatment, which can effectively cope with the erosion of long-distance transportation and complex open air environment.
certificate

Submit Your Review

All Reviews

Loading…

Call Us
Call Us