Industrial Steel Structure Construction Factory Direct Price

GAOERJI provide one-stop industrial steel construction solutions from design, production to overseas installation to ensure efficient project delivery and excellent quality. GAOERJI are the source manufacturer, deep ploughing in the field of steel structure for many years, with its own production base and professional technical team, eliminate the middleman link, directly provide you with highly competitive ex-factory price and faster response speed.

5 tons per square meter Maximum payload capacity
100 meters without column Maximum span range
high strength carbon steel Main structure material
hot galvanizing process Surface anti-corrosion treatment
more than 50 years Architectural design life
30% shorter Typical construction time
industrial steel structure construction
gear

the introduction of ultra-high power laser cutting machine, component cutting accuracy control within 0.5mm, to ensure that the site installation of docking zero gap, greatly reducing the cost and time of manual correction.

gear

With more than 30 senior design engineers, proficient in Tekla and AutoCAD software, we can make accurate structural calculations according to project requirements, optimize steel utilization, and reduce material procurement costs.

gear

strict ISO quality standards are implemented, from raw materials entering the factory to finished products being shipped, and key node acceptance procedures are set to ensure that every 1 steel beams and node plates meet the safety standards of building structures.

gear

Modular prefabrication design is adopted to realize efficient assembly in the factory. Compared with traditional construction methods, the overall project delivery cycle is shortened by more than 30%, helping enterprises to start production as soon as possible.

gear

with a professional overseas installation guidance team of more than 20 people, technical engineers can be appointed to the site for supervision and training to ensure the safety and quality of overseas projects.

gear

combined with roof photovoltaic integrated technology, through the optimization of building structure space, help enterprises to achieve energy autonomy and green low-carbon production, enhance the long-term green value of building assets.

Parameter nameSpecifications and Indicators
Main materialsQ235B/Q355B structural steel
Corrosion resistance levelC3-C5 Corrosion Protection Standards
Seismic resistance levelMeets the requirements of Level 8 intensity
Maximum span30m – 100m customizable
Fire resistance ratingA1 grade non-combustible materials
Connection methodHigh-strength bolts/full penetration welding

GAOERJI has been deeply engaged in the field of industrial steel structure for many years, and through the industrial prefabrication production mode, it has completely changed the quality instability and delay caused by traditional on-site welding. We not only provide the main body of the building, but also realize the maximum utilization of the building space through the precise structural scheme design, so that the industrial plant has high bearing capacity and takes into account the flexibility of the later expansion. In view of the long construction period of large-scale industrial projects and the difficulty of on-site coordination, GAOERJI have solved the rework problems caused by drawing errors, the large deviation of on-site installation accuracy and the pain points that overseas projects cannot be completed on schedule due to lack of technical support through digital in-depth design software and quality monitoring of whole-process factories, ensuring seamless connection from design to landing.

industrial steel structure construction
solution

In view of the pain points of poor on-site installation accuracy and high rework rate

the GAOERJI adopts laser cutting and full digital deepening design, and we control the error of beam-column interface at millimeter level, thus completely solving the secondary cutting and welding problems caused by the inability of traditional technology to align on-site.

solution

In view of the pain point of large-scale industrial construction period delay

in view of the project due to the construction schedule delay caused by the capital occupation problem, we through the factory module prefabrication and precise construction scheduling, to solve the site construction slow, by climate interference, can not be put into production on schedule.

solution

In view of the pain point of the lack of overseas engineering and technical services

in view of the installation safety hazards caused by the lack of professional guidance of customers in overseas construction, the GAOERJI provided technical engineers to supervise the installation site, and solved the structural hazards caused by the lack of professional knowledge of steel structure of the installation team.

Industrial Park Developers

Park operators who need to build large-span, high-load warehouses or standardized factories in pursuit of fast delivery and high return on investment.

industrial steel structure construction for the crowd

Large manufacturing enterprises

business owners who plan to expand automated production workshops or R & D centers and have strict standards for building structural safety, shock resistance and service life.

industrial steel structure construction for the crowd

General contractor of the project

it is necessary to find steel structure subcontracting partners with overseas site guidance ability and excellent technology to ensure the smooth implementation of large-scale international projects.

industrial steel structure construction for the crowd

Commercial real estate investors

Investors involved in multi-storey commercial steel structures or modern complex projects, focusing on architectural aesthetics and installation efficiency.

industrial steel structure construction for the crowd
011

Submit your project location, floor area and functional requirements, and we will conduct preliminary structure selection and feasibility analysis for you.

022

the design team uses AutoCAD and Tekla to issue detailed drawings. The user needs to confirm the beam-column joints and load parameters to ensure compliance with local building codes.

033

check the coordinate accuracy of foundation embedded parts before construction, and the GAOERJI will provide detailed embedded parts location drawings to guide civil construction.

044

during the installation process, GAOERJI technical experts will guide the lifting sequence of components and bolt tightening force on site to ensure the overall stability of the structure.

certificate

factory

Welcome to our Frequently Asked Questions page. We have compiled answers to common questions you may have, hoping to provide you with clear and quick solutions. If you cannot find the information you need here, please feel free to contact our customer support team.

Are GAOERJI traders or manufacturers?
GAOERJI is an entity manufacturer with independent production base and has many years of experience in steel structure export.
Do you provide design drawings?
Yes, we have more than 30 professional design engineers, using advanced software such as Tekla to provide a full range of design solutions.
How to ensure the quality of steel structure?
We have established a quality control system covering the whole process of raw materials, processing, welding and final coating to ensure that the products fully comply with international standards.
Can provide overseas on-site installation guidance?
Yes. We have a professional overseas installation team of more than 20 people, and can appoint engineers to carry out on-site supervision and installation training.
How many years is the service life of industrial steel structure?
Under the correct anti-corrosion maintenance, our steel structure building design service life can usually reach more than 50 years.
How long is the project lead time?
The specific period depends on the scale of the project. We will provide you with a detailed construction schedule and delivery node when signing the contract.
E-mail*
Number*
Country
Name
Your Question
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

Industrial Steel Structure Construction Factory Direct Price

GAOERJI provide one-stop industrial steel construction solutions from design, production to overseas installation to ensure efficient project delivery and excellent quality. GAOERJI are the source manufacturer, deep ploughing in the field of steel structure for many years, with its own production base and professional technical team, eliminate the middleman link, directly provide you with highly competitive ex-factory price and faster response speed.

industrial steel structure construction

gear

the introduction of ultra-high power laser cutting machine, component cutting accuracy control within 0.5mm, to ensure that the site installation of docking zero gap, greatly reducing the cost and time of manual correction.

gear

With more than 30 senior design engineers, proficient in Tekla and AutoCAD software, we can make accurate structural calculations according to project requirements, optimize steel utilization, and reduce material procurement costs.

gear

strict ISO quality standards are implemented, from raw materials entering the factory to finished products being shipped, and key node acceptance procedures are set to ensure that every 1 steel beams and node plates meet the safety standards of building structures.

gear

Modular prefabrication design is adopted to realize efficient assembly in the factory. Compared with traditional construction methods, the overall project delivery cycle is shortened by more than 30%, helping enterprises to start production as soon as possible.

gear

with a professional overseas installation guidance team of more than 20 people, technical engineers can be appointed to the site for supervision and training to ensure the safety and quality of overseas projects.

gear

combined with roof photovoltaic integrated technology, through the optimization of building structure space, help enterprises to achieve energy autonomy and green low-carbon production, enhance the long-term green value of building assets.

Parameter nameSpecifications and Indicators
Main materialsQ235B/Q355B structural steel
Corrosion resistance levelC3-C5 Corrosion Protection Standards
Seismic resistance levelMeets the requirements of Level 8 intensity
Maximum span30m – 100m customizable
Fire resistance ratingA1 grade non-combustible materials
Connection methodHigh-strength bolts/full penetration welding

industrial steel structure construction contrast point

industrial steel structure construction
solution
In view of the pain points of poor on-site installation accuracy and high rework rate

the GAOERJI adopts laser cutting and full digital deepening design, and we control the error of beam-column interface at millimeter level, thus completely solving the secondary cutting and welding problems caused by the inability of traditional technology to align on-site.

solution
In view of the pain point of large-scale industrial construction period delay

in view of the project due to the construction schedule delay caused by the capital occupation problem, we through the factory module prefabrication and precise construction scheduling, to solve the site construction slow, by climate interference, can not be put into production on schedule.

solution
In view of the pain point of the lack of overseas engineering and technical services

in view of the installation safety hazards caused by the lack of professional guidance of customers in overseas construction, the GAOERJI provided technical engineers to supervise the installation site, and solved the structural hazards caused by the lack of professional knowledge of steel structure of the installation team.

Industrial Park Developers

Park operators who need to build large-span, high-load warehouses or standardized factories in pursuit of fast delivery and high return on investment.

industrial steel structure construction for the crowd

Large manufacturing enterprises

business owners who plan to expand automated production workshops or R & D centers and have strict standards for building structural safety, shock resistance and service life.

industrial steel structure construction for the crowd

General contractor of the project

it is necessary to find steel structure subcontracting partners with overseas site guidance ability and excellent technology to ensure the smooth implementation of large-scale international projects.

industrial steel structure construction for the crowd

Commercial real estate investors

Investors involved in multi-storey commercial steel structures or modern complex projects, focusing on architectural aesthetics and installation efficiency.

industrial steel structure construction for the crowd
011

Submit your project location, floor area and functional requirements, and we will conduct preliminary structure selection and feasibility analysis for you.

022

the design team uses AutoCAD and Tekla to issue detailed drawings. The user needs to confirm the beam-column joints and load parameters to ensure compliance with local building codes.

033

check the coordinate accuracy of foundation embedded parts before construction, and the GAOERJI will provide detailed embedded parts location drawings to guide civil construction.

044

during the installation process, GAOERJI technical experts will guide the lifting sequence of components and bolt tightening force on site to ensure the overall stability of the structure.

Know Us and Contact Us

*
*
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!
FAQ

FAQ

Are GAOERJI traders or manufacturers?
GAOERJI is an entity manufacturer with independent production base and has many years of experience in steel structure export.
Do you provide design drawings?
Yes, we have more than 30 professional design engineers, using advanced software such as Tekla to provide a full range of design solutions.
How to ensure the quality of steel structure?
We have established a quality control system covering the whole process of raw materials, processing, welding and final coating to ensure that the products fully comply with international standards.
Can provide overseas on-site installation guidance?
Yes. We have a professional overseas installation team of more than 20 people, and can appoint engineers to carry out on-site supervision and installation training.
How many years is the service life of industrial steel structure?
Under the correct anti-corrosion maintenance, our steel structure building design service life can usually reach more than 50 years.
How long is the project lead time?
The specific period depends on the scale of the project. We will provide you with a detailed construction schedule and delivery node when signing the contract.
certificate

Submit Your Review

All Reviews

Loading…

Call Us
Call Us