...

20×20 Steel Building Get Your Best Quote

The GAOERJI 20 × 20 steel building adopts modular assembly and high-strength coating to provide fast construction and excellent wind and snow resistance for the project. GAOERJI is a real steel structure source manufacturer, with independent production base and advanced CNC equipment, eliminating middlemen links, to provide you with more competitive factory direct sales prices and efficient and fast delivery period.

Acier de construction à haute résistance Matériau :
hot dip aluminum zinc anti-corrosion coating Traitement de surface :
6 m beamless single span Width:
6 meters single module Longueur maximale :
within a single day quickly assembled Durée de la construction :
140kg of snow per square meter Maximum load capacity:
more than 50 years maintenance-free Durée de vie :
20×20 steel building
gear

The structural components are pre-perforated with high precision in the factory, and the corrosion-resistant bolts are directly fastened and connected on site, eliminating the on-site electric welding operation by 100%. The construction period is shortened by more than 60%, greatly reducing the cost of local labor installation.

gear

After strict structural calculation, the 20 × 20 steel building has a wind resistance of 225 kilometers per hour and can withstand a snow load of 1.4千帕 per square meter, effectively ensuring the safety of equipment and personnel in harsh weather environments.

gear

The factory is equipped with high-power CNC laser cutting machine and cold bending forming production line, and the dimensional tolerance of components is controlled within 0.2mm. The extremely high assembly accuracy ensures zero error of on-site assembly and prevents water leakage in the later period of traditional small houses.

gear

The skeleton and outer plate are made of high-grade steel plate with double-sided hot-dip aluminum-zinc plating layer reaching 150g per square meter, which improves the anti-corrosion and anti-rust ability by 4 times in atmospheric environment and provides long-term paint-free anti-rust protection for more than 50 years.

gear

Designed with a self-supporting frame and no intermediate columns, the 400-square-foot interior space is 100 percent barrier-free, providing great convenience for forklift rotation, material stacking or on-site office equipment arrangement.

gear

Gorky has a team of more than 30 professional design engineers who use professional steel deepening software to provide contractors with detailed drawings that comply with local building regulations and ensure that 100 per cent of the drawings are approved by the local government.

Éléments de paramètresSpecifications and Standard DataStructure and performance description
Main body size6.1 meters long x 6.1 meters wide x 3.0 meters highStandard 400 square feet usable area
Load-bearing frame materialHigh-frequency welded square steel pipe Q235BYield strength reaches 235 MPa
Wall and roof panelsHot-dip aluminized zinc color-coated steel sheet AZ1500.5 mm thick, UV resistant and colorfast.
Traitement de surface anticorrosionDouble-sided hot-dip galvanizing: not less than 120 grams per square meterThe frame and accessories are fully rustproofed.
Field connection methodHigh-strength bolt fasteningThe complete set includes waterproof washers and lock nuts.
Structural design standardsCompliant with US building design standardsWind load up to 140 miles per hour
Fire resistance safety ratingMeets the national Class A non-combustible standardGreatly reduces the risk of structural collapse during a fire.
Environmentally friendly and recyclable characteristicsMore than 95% of the structural materials are recyclable.Meets green building and environmental assessment standards

In the field of engineering matching and modular construction, traditional small houses are often rough on-site welding and manual cutting due to lack of precision, which not only lengthens the construction period, but also easily produces rust and cracking at the weld. In contrast, the 20 × 20 steel building produced by GAOERJI is manufactured by modern high-precision numerical control machine tools from skeleton cutting to plate forming, and the hole tolerance of the components is strictly limited to 0.2mm. This means that the contractor does not need to perform any secondary cutting or reaming when assembling on site, which greatly improves the construction efficiency. In addition, in terms of anti-corrosion and weather resistance, GAOERJI also show significant technical vertical advantages. The common light steel structure buildings on the market often use ordinary low-density hot-dip galvanized steel, which starts to rust in 3 to 5 years in a humid or industrial salt spray environment. In the manufacture of 20 × 20 steel building by Golgi, the core color coated plates were all upgraded to double-sided hot-dip aluminum-zinc plating process. Compared with ordinary hot-dip galvanized color plates, the anti-corrosion performance was improved by more than 4 times, which can ensure that the building does not need frequent surface painting and rust prevention in the service life of more than 50 years.

20×20 steel building
icon

Field construction without power on-site welding inconvenience:

Field projects often face temporary power shortages. The GAOERJI provides a full set of factory high-precision pre-perforated components, which can be formed by simply manually tightening the bolts on site, eliminating the use of high-power electric welding machines.

icon

Small size housing components packaging chaos scattered:

Contractors often cause on-site leakage and missing parts due to bulk shipments from manufacturers. GAOERJI the implementation of fine module packaging, bolts, seals and corresponding steel parts classification packing, to prevent the lack of parts due to delay in the progress of the project.

icon

High winds and heavy rain weather cause water leakage in wallboard joints:

Traditional board room often seams leakage in heavy rain. The GAOERJI adopts double protection design of precision lock buckle and waterproof high elastic sealing strip, and keeps the interior dry under heavy rainfall of 100mm per hour.

industrial park and logistics real estate general contractor:

Engineering procurement teams for security kiosks, small equipment distribution rooms or monitoring rooms need to be quickly deployed in the park and plant. The GAOERJI standardized components can realize synchronous planning and efficient assembly with large projects.

20 × 20 steel building for people

Municipal infrastructure and road construction contractors:

It is necessary to establish a safe, durable, wind-resistant temporary headquarters, material warehouse or employee lounge unit at the construction site. The product can be quickly disassembled and used many times, and the extremely high recovery reuse rate can greatly dilute the construction cost.

20 × 20 steel building for people

Oil and gas and energy system integrators:

Integrators who need to erect instrument measuring rooms, cabinet shelters or valve chamber canopies in remote mining areas and gas wells. The high-grade weather-resistant and sealed dust-proof structure provided by Golgi can ensure the smooth operation of high-precision equipment in harsh environments.

20 × 20 steel building for people

Communication base station and distribution network construction subcontractor:

A telecommunications subcontractor who needs to quickly build a small equipment protective house next to the tower. The product can complete the main body assembly in one day, greatly shorten the construction period of the base station, and the double-layer galvanized corrosion-resistant plate can ensure maintenance-free within 50 years.

20 × 20 steel building for people
011

Complete the concrete leveling foundation pouring according to the drawings, and retest the diagonal of the four corner points and the bolt embedded slot to ensure that the error is within 2mm.

022

Assemble steel beams, columns and connecting beams on the ground in turn. After erecting the steel frame, adjust the verticality with a level and lock it with high torque double-headed anti-loosening bolts.

033

High-strength color-coated enclosure steel plates are installed from one side to the other in turn, special high-elasticity waterproof sealing strips are laid at the joints, and self-tapping fasteners are used for reinforcement.

044

Push the matching steel rolling gate and aluminum alloy window into the reserved card slot, and fill the weather-resistant polyurethane sealant around to complete the last layer of waterproof barrier of the 20 × 20 room.

certificate

factory

Bienvenue sur notre page Foire aux questions. Nous avons rassemblé les réponses aux questions les plus courantes que vous pouvez vous poser, dans l'espoir de vous fournir des solutions claires et rapides. Si vous ne trouvez pas l'information dont vous avez besoin ici, n'hésitez pas à contacter notre équipe d'assistance à la clientèle.

Q: Can GAOERJI 20 × 20 steel building be assembled without any experience?
A: Sure. Our products adopt full bolt connection design, and all components are pre-perforated and classified numbered when leaving the factory. We provide extremely detailed assembly manuals and video guides for easy assembly with basic hand tools.
Q: For this small-sized steel structure building, can you add doors and windows or change the size of doors and windows according to the specific location?
A: Totally. Gorky has a professional design and research team. We can customize the location and size of non-standard doors and windows on any facade according to the actual working conditions of your equipment storage or on-site office work.
Q: What is the size of the housing package? Will it bring high transportation costs to international shipping?
A: We use flat dense container packaging technology, the whole set of components can be efficiently folded flat, packaging volume is very small. An ordinary container can hold multiple sets of products of this specification, thus helping engineers to greatly save shipping positions and tariff costs.
Q: 20 × 20 steel building is easy to rust and corrode when used in high salt spray areas such as seaside?
A: No. Golgi has adopted thick hot-dip galvanizing treatment on the surface of the skeleton, while the wall surface and roof plate are upgraded with high anti-corrosion hot-dip aluminum-zinc plating process, which has excellent salt spray resistance and acid rain resistance and ensures that it will not rust for long-term use at the seaside.
Q: Can Golgi issue a complete certificate with material testing and inspection for this small steel package?
A: Yes. Zhejiang Gorky is a real manufacturing plant, strictly follow the comprehensive quality inspection process. We can provide complete factory quality inspection and test certificates from raw material grade, surface coating thickness to factory dimensional tolerance for each order.
Q: If our project is overseas and we encounter difficulties in later assembly, can Gorky send someone to guide us?
A: Yes. We have more than 20 professional overseas guide installation team. According to the agreement of the project construction contract, we can send experienced design or technical engineers to the site to provide you with a full range of technical guidance and supervision services.
Courrier électronique*
Nombre*
Pays
Nom
Votre question
Soumettre !
Succès !
Échec de la soumission ! Veuillez réessayer plus tard!
Erreur de format d'e-mail !
Erreur de format!

20×20 Steel Building Get Your Best Quote

The GAOERJI 20 × 20 steel building adopts modular assembly and high-strength coating to provide fast construction and excellent wind and snow resistance for the project. GAOERJI is a real steel structure source manufacturer, with independent production base and advanced CNC equipment, eliminating middlemen links, to provide you with more competitive factory direct sales prices and efficient and fast delivery period.

20×20 steel building

gear

The structural components are pre-perforated with high precision in the factory, and the corrosion-resistant bolts are directly fastened and connected on site, eliminating the on-site electric welding operation by 100%. The construction period is shortened by more than 60%, greatly reducing the cost of local labor installation.

gear

After strict structural calculation, the 20 × 20 steel building has a wind resistance of 225 kilometers per hour and can withstand a snow load of 1.4千帕 per square meter, effectively ensuring the safety of equipment and personnel in harsh weather environments.

gear

The factory is equipped with high-power CNC laser cutting machine and cold bending forming production line, and the dimensional tolerance of components is controlled within 0.2mm. The extremely high assembly accuracy ensures zero error of on-site assembly and prevents water leakage in the later period of traditional small houses.

gear

The skeleton and outer plate are made of high-grade steel plate with double-sided hot-dip aluminum-zinc plating layer reaching 150g per square meter, which improves the anti-corrosion and anti-rust ability by 4 times in atmospheric environment and provides long-term paint-free anti-rust protection for more than 50 years.

gear

Designed with a self-supporting frame and no intermediate columns, the 400-square-foot interior space is 100 percent barrier-free, providing great convenience for forklift rotation, material stacking or on-site office equipment arrangement.

gear

Gorky has a team of more than 30 professional design engineers who use professional steel deepening software to provide contractors with detailed drawings that comply with local building regulations and ensure that 100 per cent of the drawings are approved by the local government.

Éléments de paramètresSpecifications and Standard DataStructure and performance description
Main body size6.1 meters long x 6.1 meters wide x 3.0 meters highStandard 400 square feet usable area
Load-bearing frame materialHigh-frequency welded square steel pipe Q235BYield strength reaches 235 MPa
Wall and roof panelsHot-dip aluminized zinc color-coated steel sheet AZ1500.5 mm thick, UV resistant and colorfast.
Traitement de surface anticorrosionDouble-sided hot-dip galvanizing: not less than 120 grams per square meterThe frame and accessories are fully rustproofed.
Field connection methodHigh-strength bolt fasteningThe complete set includes waterproof washers and lock nuts.
Structural design standardsCompliant with US building design standardsWind load up to 140 miles per hour
Fire resistance safety ratingMeets the national Class A non-combustible standardGreatly reduces the risk of structural collapse during a fire.
Environmentally friendly and recyclable characteristicsMore than 95% of the structural materials are recyclable.Meets green building and environmental assessment standards

20 × 20 steel building contrast point

20×20 steel building
solution
Field construction without power on-site welding inconvenience:

Field projects often face temporary power shortages. The GAOERJI provides a full set of factory high-precision pre-perforated components, which can be formed by simply manually tightening the bolts on site, eliminating the use of high-power electric welding machines.

solution
Small size housing components packaging chaos scattered:

Contractors often cause on-site leakage and missing parts due to bulk shipments from manufacturers. GAOERJI the implementation of fine module packaging, bolts, seals and corresponding steel parts classification packing, to prevent the lack of parts due to delay in the progress of the project.

solution
High winds and heavy rain weather cause water leakage in wallboard joints:

Traditional board room often seams leakage in heavy rain. The GAOERJI adopts double protection design of precision lock buckle and waterproof high elastic sealing strip, and keeps the interior dry under heavy rainfall of 100mm per hour.

industrial park and logistics real estate general contractor:

Engineering procurement teams for security kiosks, small equipment distribution rooms or monitoring rooms need to be quickly deployed in the park and plant. The GAOERJI standardized components can realize synchronous planning and efficient assembly with large projects.

20 × 20 steel building for people

Municipal infrastructure and road construction contractors:

It is necessary to establish a safe, durable, wind-resistant temporary headquarters, material warehouse or employee lounge unit at the construction site. The product can be quickly disassembled and used many times, and the extremely high recovery reuse rate can greatly dilute the construction cost.

20 × 20 steel building for people

Oil and gas and energy system integrators:

Integrators who need to erect instrument measuring rooms, cabinet shelters or valve chamber canopies in remote mining areas and gas wells. The high-grade weather-resistant and sealed dust-proof structure provided by Golgi can ensure the smooth operation of high-precision equipment in harsh environments.

20 × 20 steel building for people

Communication base station and distribution network construction subcontractor:

A telecommunications subcontractor who needs to quickly build a small equipment protective house next to the tower. The product can complete the main body assembly in one day, greatly shorten the construction period of the base station, and the double-layer galvanized corrosion-resistant plate can ensure maintenance-free within 50 years.

20 × 20 steel building for people
011

Complete the concrete leveling foundation pouring according to the drawings, and retest the diagonal of the four corner points and the bolt embedded slot to ensure that the error is within 2mm.

022

Assemble steel beams, columns and connecting beams on the ground in turn. After erecting the steel frame, adjust the verticality with a level and lock it with high torque double-headed anti-loosening bolts.

033

High-strength color-coated enclosure steel plates are installed from one side to the other in turn, special high-elasticity waterproof sealing strips are laid at the joints, and self-tapping fasteners are used for reinforcement.

044

Push the matching steel rolling gate and aluminum alloy window into the reserved card slot, and fill the weather-resistant polyurethane sealant around to complete the last layer of waterproof barrier of the 20 × 20 room.

Nous connaître et nous contacter

Courrier électronique*
Nombre*
Pays
Nom
Votre question
Soumettre !
Succès !
Échec de la soumission ! Veuillez réessayer plus tard!
Erreur de format d'e-mail !
Erreur de format!

FAQ

Q: Can GAOERJI 20 × 20 steel building be assembled without any experience?
A: Sure. Our products adopt full bolt connection design, and all components are pre-perforated and classified numbered when leaving the factory. We provide extremely detailed assembly manuals and video guides for easy assembly with basic hand tools.
Q: For this small-sized steel structure building, can you add doors and windows or change the size of doors and windows according to the specific location?
A: Totally. Gorky has a professional design and research team. We can customize the location and size of non-standard doors and windows on any facade according to the actual working conditions of your equipment storage or on-site office work.
Q: What is the size of the housing package? Will it bring high transportation costs to international shipping?
A: We use flat dense container packaging technology, the whole set of components can be efficiently folded flat, packaging volume is very small. An ordinary container can hold multiple sets of products of this specification, thus helping engineers to greatly save shipping positions and tariff costs.
Q: 20 × 20 steel building is easy to rust and corrode when used in high salt spray areas such as seaside?
A: No. Golgi has adopted thick hot-dip galvanizing treatment on the surface of the skeleton, while the wall surface and roof plate are upgraded with high anti-corrosion hot-dip aluminum-zinc plating process, which has excellent salt spray resistance and acid rain resistance and ensures that it will not rust for long-term use at the seaside.
Q: Can Golgi issue a complete certificate with material testing and inspection for this small steel package?
A: Yes. Zhejiang Gorky is a real manufacturing plant, strictly follow the comprehensive quality inspection process. We can provide complete factory quality inspection and test certificates from raw material grade, surface coating thickness to factory dimensional tolerance for each order.
Q: If our project is overseas and we encounter difficulties in later assembly, can Gorky send someone to guide us?
A: Yes. We have more than 20 professional overseas guide installation team. According to the agreement of the project construction contract, we can send experienced design or technical engineers to the site to provide you with a full range of technical guidance and supervision services.
certificate

Soumettre votre avis

Tous les commentaires

Chargement...

Appelez-nous
Appelez-nous