GAOERJI fabricated mining and building steel structures are designed with high capacity and precision to accommodate extreme conditions. As a physical manufacturing plant, GAOERJI eliminate all intermediate links and directly provide factory direct sales and mass customization to ensure that you enjoy better ex-factory prices and shorter delivery cycles.

high strength low alloy steel Material
hot dip galvanized anti-corrosion Surface treatment
twelve to forty-five meters Span range
5 tons per square meter Load capacity
not less than fifty years Service life
site assembly shortened by 40% Construction time
fabricated steel structures for mining and construction
gear

use professional steel structure software to carry out one-to-one modeling, control the error of drawing assembly nodes within 0.5mm, and avoid secondary modification on site in the design stage.

gear

the use of the average zinc layer thickness of more than eighty-five microns of hot-dip galvanizing process, acid and alkali resistance and high humidity, in the harsh mining environment anti-corrosion life of more than thirty years.

gear

high-quality steel with yield strength of 355 MPa is selected to meet the requirements of high seismic intensity fortification and ensure the overall structural stability of heavy mineral processing equipment during operation.

gear

all steel components are prefabricated in the factory with high precision, no welding is required on site, and the use of full bolt connection shortens the construction period of on-site assembly by 45%.

gear

the maximum wind-resistant design load can reach 12 levels, and the floor live load design can reach up to 5 tons per square meter to ensure the safe operation of heavy equipment such as vibrating screens and crushers.

gear

establish a whole process inspection mechanism covering steel plate feeding, welding, anti-corrosion and leaving the factory, and the qualified rate of weld flaw detection reaches 100% to ensure the quality of products leaving the factory from the source.

Parameter ItemsIndustry standard specificationsKey performance and specifications
Main materialsQ355B / Q345B grade structural steelIt possesses excellent yield strength and low-temperature impact toughness, making it suitable for load-bearing structures.
Steel Structure Design CodeMeets national standards and mainstream design standards such as American and European standards.The structure is optimized using specialized calculation software, meeting compliance requirements in multiple countries.
Node connection methodFriction-type high-strength bolt connection / On-site welding-free designIncrease on-site assembly speed, reduce reliance on skilled welders, and ensure safety.
Non-destructive testing of weldsUltrasonic flaw detection / Magnetic particle flaw detection100% flaw detection of critical parts of dynamic load equipment supports
Surface coating processSandblasting to Sa2.5 grade for rust removal, followed by application of heavy-duty anti-corrosion coating.The paint film has strong adhesion and effectively resists the erosion of corrosive media in mining areas.
Seismic fortification intensityMeets the seismic fortification design requirements of intensity eight and above.The structure has good ductility and energy dissipation capacity, and is adapted to geological activities in the mining area.
Maximum single span widthCustomizable column-free spaces with a single span of up to 45 meters.Allows for the free passage and operation of large mining equipment, loaders, and vehicles.

As a senior manufacturer of prefabricated mines and building steel structures, GAOERJI is committed to solving the problem of lengthy on-site construction cycles through precision factory prefabrication. We not only have a team of more than 30 design engineers for high-precision control, but also provide a complete closed-loop service from material processing to overseas installation guidance to ensure that the building body can withstand the vibration and harsh weather of the mining area.Compared to traditional traders and small-scale processing plants, GAOERJI in heavy-duty and anti-corrosion process has a more stringent control. We directly meet the terminal requirements, relying on the automated H-beam production line and high-standard non-destructive testing technology, while providing high-precision components, it greatly reduces the user’s secondary modification and later maintenance costs.

fabricated steel structures for mining and construction
icon

The remote installation efficiency of the project site is low

for remote mining areas with inconvenient transportation and lack of skilled workers, we adopt the weldless assembly design of full bolt connection and cooperate with professional on-site guidance to reduce on-site labor costs.

icon

Structural fatigue caused by vibration of heavy mining machine

in the face of high-frequency vibration equipment such as crushing and screening, we optimize the node design and improve the weld flaw detection standard to prevent cracking and failure of steel frame joints caused by long-term vibration.

icon

Acid rain and high humidity environment in mining area are easy to rust

for high corrosion mining area, we provide hot dip galvanized or heavy anti-corrosion coating with a thickness of more than 85 microns to block the erosion of harmful media on the steel substrate.

General contractor for overseas projects

contractors who undertake mining areas and infrastructure construction. They need steel structure suppliers with perfect 3D deepening design and high assembly accuracy to match their compact engineering nodes.

fabricated steel structures for mining and construction Crowd

Mining resources development enterprises

entities that mainly mine minerals. In the construction of mineral processing plants, crushing stations, belt corridors and office camps, the pursuit of rapid production, anti-corrosion and durable and with high seismic intensity of heavy industrial buildings.

fabricated steel structures for mining and construction Crowd

Architectural Engineering Design and Research Institute

the unit responsible for the design of heavy industrial parks and mining projects. Suppliers are required to be able to seamlessly interface detailed drawings and provide structural calculations and precision assembly components that meet industry standards.

fabricated steel structures for mining and construction Crowd

Industrial park plant investors

investors who build standard industrial plants and logistics warehouses for lease or self-use. They focus on the overall return on investment and favor steel buildings with low life cycle maintenance costs and short construction cycles.

fabricated steel structures for mining and construction Crowd
011

before the components are delivered to the site, re-test the foundation axis, elevation and spacing of embedded parts with theodolite to ensure that the deviation is within the specified tolerance range.

022

place steel columns, steel beams and supporting components in different areas according to the packing list, clean the surface of connecting plate before hoisting, and prepare high-strength bolts.

033

hoisting shall be carried out in the order of first steel column, then main beam, first middle and then both sides. After the member is in place, temporarily fix it with cable wind rope and preliminarily correct the verticality.

044

the joint high-strength bolts are initially and finally tightened to achieve the design torque. Subsequently, the overall structure of the steel frame will be finally calibrated, and the pouring will be completed after confirmation.

certificate

factory

Welcome to our Frequently Asked Questions page. We have compiled answers to common questions you may have, hoping to provide you with clear and quick solutions. If you cannot find the information you need here, please feel free to contact our customer support team.

Question 1: How to ensure that the fabricated steel structure is not damaged and rusted during ocean transportation?
Answer: Our components will be classified and packed, and rubber pads will be installed on vulnerable parts. The surface is treated with hot-dip galvanized or long-term anti-corrosion paint, and the sea container is bound and fixed to effectively prevent salt spray corrosion and collision.
Question 2: How to guarantee the stability of steel structure in the face of severe vibration of heavy mining equipment?
Answer: In the design, we will use the dynamic load factor for structural calculation, strengthen the secondary beam and diagonal brace at the support part of the equipment, and all use high-strength bolt connection, so as to absorb and disperse the stress caused by high-frequency vibration.
Question 3: Can you provide detailed design and drawing verification services for steel structures?
Answer: Yes, it is possible. We have a professional steel structure design team, using professional design software for high-precision modeling, which can seamlessly connect the original drawings provided by customers and avoid construction conflicts in advance.
Question 4: What if our construction team has no experience in steel structure assembly during on-site construction?
Answer: We not only provide detailed assembly construction drawings and corresponding coded components, but also send engineers with rich overseas experience to the site to provide full installation guidance and technical training.
Question 5: What is the overall seismic and wind resistance of the fabricated steel structure?
Answer: Our products mainly use high-strength structural steel. According to different project locations, the design seismic intensity can reach eight degrees, and the wind load can withstand 12 strong winds to ensure safety and stability in severe weather.
Question 6: How long will it take from the order to the final delivery of the product?
Answer: The production cycle depends on the size of the project and the complexity of the design. After the drawings are confirmed, the steel structure of the medium-sized mine workshop is usually processed within 30 to 45 days and has the factory conditions.
E-mail*
Number*
Country
Name
Your Question
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

Fabricated Steel Structures For Mining And Construction

GAOERJI fabricated mining and building steel structures are designed with high capacity and precision to accommodate extreme conditions. As a physical manufacturing plant, GAOERJI eliminate all intermediate links and directly provide factory direct sales and mass customization to ensure that you enjoy better ex-factory prices and shorter delivery cycles.

fabricated steel structures for mining and construction

gear

use professional steel structure software to carry out one-to-one modeling, control the error of drawing assembly nodes within 0.5mm, and avoid secondary modification on site in the design stage.

gear

the use of the average zinc layer thickness of more than eighty-five microns of hot-dip galvanizing process, acid and alkali resistance and high humidity, in the harsh mining environment anti-corrosion life of more than thirty years.

gear

high-quality steel with yield strength of 355 MPa is selected to meet the requirements of high seismic intensity fortification and ensure the overall structural stability of heavy mineral processing equipment during operation.

gear

all steel components are prefabricated in the factory with high precision, no welding is required on site, and the use of full bolt connection shortens the construction period of on-site assembly by 45%.

gear

the maximum wind-resistant design load can reach 12 levels, and the floor live load design can reach up to 5 tons per square meter to ensure the safe operation of heavy equipment such as vibrating screens and crushers.

gear

establish a whole process inspection mechanism covering steel plate feeding, welding, anti-corrosion and leaving the factory, and the qualified rate of weld flaw detection reaches 100% to ensure the quality of products leaving the factory from the source.

Parameter ItemsIndustry standard specificationsKey performance and specifications
Main materialsQ355B / Q345B grade structural steelIt possesses excellent yield strength and low-temperature impact toughness, making it suitable for load-bearing structures.
Steel Structure Design CodeMeets national standards and mainstream design standards such as American and European standards.The structure is optimized using specialized calculation software, meeting compliance requirements in multiple countries.
Node connection methodFriction-type high-strength bolt connection / On-site welding-free designIncrease on-site assembly speed, reduce reliance on skilled welders, and ensure safety.
Non-destructive testing of weldsUltrasonic flaw detection / Magnetic particle flaw detection100% flaw detection of critical parts of dynamic load equipment supports
Surface coating processSandblasting to Sa2.5 grade for rust removal, followed by application of heavy-duty anti-corrosion coating.The paint film has strong adhesion and effectively resists the erosion of corrosive media in mining areas.
Seismic fortification intensityMeets the seismic fortification design requirements of intensity eight and above.The structure has good ductility and energy dissipation capacity, and is adapted to geological activities in the mining area.
Maximum single span widthCustomizable column-free spaces with a single span of up to 45 meters.Allows for the free passage and operation of large mining equipment, loaders, and vehicles.

fabricated steel structures for mining and construction contrast points

fabricated steel structures for mining and construction
solution
The remote installation efficiency of the project site is low

for remote mining areas with inconvenient transportation and lack of skilled workers, we adopt the weldless assembly design of full bolt connection and cooperate with professional on-site guidance to reduce on-site labor costs.

solution
Structural fatigue caused by vibration of heavy mining machine

in the face of high-frequency vibration equipment such as crushing and screening, we optimize the node design and improve the weld flaw detection standard to prevent cracking and failure of steel frame joints caused by long-term vibration.

solution
Acid rain and high humidity environment in mining area are easy to rust

for high corrosion mining area, we provide hot dip galvanized or heavy anti-corrosion coating with a thickness of more than 85 microns to block the erosion of harmful media on the steel substrate.

General contractor for overseas projects

contractors who undertake mining areas and infrastructure construction. They need steel structure suppliers with perfect 3D deepening design and high assembly accuracy to match their compact engineering nodes.

fabricated steel structures for mining and construction Crowd

Mining resources development enterprises

entities that mainly mine minerals. In the construction of mineral processing plants, crushing stations, belt corridors and office camps, the pursuit of rapid production, anti-corrosion and durable and with high seismic intensity of heavy industrial buildings.

fabricated steel structures for mining and construction Crowd

Architectural Engineering Design and Research Institute

the unit responsible for the design of heavy industrial parks and mining projects. Suppliers are required to be able to seamlessly interface detailed drawings and provide structural calculations and precision assembly components that meet industry standards.

fabricated steel structures for mining and construction Crowd

Industrial park plant investors

investors who build standard industrial plants and logistics warehouses for lease or self-use. They focus on the overall return on investment and favor steel buildings with low life cycle maintenance costs and short construction cycles.

fabricated steel structures for mining and construction Crowd
011

before the components are delivered to the site, re-test the foundation axis, elevation and spacing of embedded parts with theodolite to ensure that the deviation is within the specified tolerance range.

022

place steel columns, steel beams and supporting components in different areas according to the packing list, clean the surface of connecting plate before hoisting, and prepare high-strength bolts.

033

hoisting shall be carried out in the order of first steel column, then main beam, first middle and then both sides. After the member is in place, temporarily fix it with cable wind rope and preliminarily correct the verticality.

044

the joint high-strength bolts are initially and finally tightened to achieve the design torque. Subsequently, the overall structure of the steel frame will be finally calibrated, and the pouring will be completed after confirmation.

Know Us and Contact Us

E-mail*
Number*
Country
Name
Your Question
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

FAQ

Question 1: How to ensure that the fabricated steel structure is not damaged and rusted during ocean transportation?
Answer: Our components will be classified and packed, and rubber pads will be installed on vulnerable parts. The surface is treated with hot-dip galvanized or long-term anti-corrosion paint, and the sea container is bound and fixed to effectively prevent salt spray corrosion and collision.
Question 2: How to guarantee the stability of steel structure in the face of severe vibration of heavy mining equipment?
Answer: In the design, we will use the dynamic load factor for structural calculation, strengthen the secondary beam and diagonal brace at the support part of the equipment, and all use high-strength bolt connection, so as to absorb and disperse the stress caused by high-frequency vibration.
Question 3: Can you provide detailed design and drawing verification services for steel structures?
Answer: Yes, it is possible. We have a professional steel structure design team, using professional design software for high-precision modeling, which can seamlessly connect the original drawings provided by customers and avoid construction conflicts in advance.
Question 4: What if our construction team has no experience in steel structure assembly during on-site construction?
Answer: We not only provide detailed assembly construction drawings and corresponding coded components, but also send engineers with rich overseas experience to the site to provide full installation guidance and technical training.
Question 5: What is the overall seismic and wind resistance of the fabricated steel structure?
Answer: Our products mainly use high-strength structural steel. According to different project locations, the design seismic intensity can reach eight degrees, and the wind load can withstand 12 strong winds to ensure safety and stability in severe weather.
Question 6: How long will it take from the order to the final delivery of the product?
Answer: The production cycle depends on the size of the project and the complexity of the design. After the drawings are confirmed, the steel structure of the medium-sized mine workshop is usually processed within 30 to 45 days and has the factory conditions.
certificate

Submit Your Review

All Reviews

Loading…

Call Us
Call Us