Bridge Prefabricated Competitive Price Manufacturer 

GAOERJI prefabricated bridges are manufactured in standardized factories and assembled on site in a modular manner, which can shorten the open circuit construction time by more than 60% and significantly reduce the risk of on-site wet work. GAOERJI is a source factory integrating design and manufacturing, skipping intermediate trade links and providing you with highly competitive direct selling prices and reliable quality in line with international load standards.

Q345B/Q420 grade high strength steel Material
single span up to 60 meters Span range
support HL-93 heavy load class Maximum load
site assembly only 3-7 days Construction time
more than 100 years design life Service life
hot dip zinc or long-lasting fluorocarbon paint Surface treatment
10.9 high-strength bolts Connection
bridge prefabricated

gear

All main girders and cross beams are prefabricated in the factory, and only crane lifting and bolt fastening are required on site. This model reduces the traditional several-month cast-in-place period to one week, greatly reducing traffic control time and social costs.

gear

CNC plasma cutting and robot welding process are adopted to ensure that the geometric dimension tolerance of large components is controlled within 1mm. High-precision prefabrication ensures “100 alignment of holes” during on-site assembly, avoiding hidden dangers of rework.

gear

Finite element analysis according to AASHTO LRFD standard ensures that the bridge can easily carry more than 40 tons of standard trucks and special super-heavy equipment, suitable for harsh industrial and logistics transportation environments.

gear

The steel component is immersed in a zinc liquid at 450°C to form an alloy layer with a thickness of not less than 85 microns. This physical isolation ensures that the bridge will not need to be repainted for maintenance for 30 years in a wet, salt spray environment.

gear

The bridge structure is disassembled into units conforming to standard 1333.32cm container sizes. This optimized design not only reduces the cost of cross-border shipping costs, but also solves the logistics pain point of narrow roads and ultra-long components in remote mountainous areas.

gear

there is no need for large-scale formwork support and concrete pouring on the site, which greatly reduces construction waste and pollution to surrounding water bodies and vegetation. It is the first choice for infrastructure construction in nature reserves and environmentally sensitive areas.

Technical indicatorsParameter Standardillustrate
Main beam typeSteel I-beams / Steel pipe trusses / Modular box girdersSelect the type based on span and load requirements.
Design SpecificationsAASHTO LRFD / Eurocode 3Conforms to mainstream international road and bridge design standards
Fatigue strength2 million cycles of load testingEnsure structural durability under heavy traffic.
Bridge deck materialCorrugated steel sheet / Precast concrete slab / FiberglassSupports multiple road paving schemes
Installation tolerancesMid-span deflection ≤ L/800Strictly implement the verticality specifications for high-grade bridges
Fastener gradeASTM A325 / A490 High Strength BoltsEnsure the shear and tensile strength of the node connections
Seismic fortification0.4g acceleration intensity designInfrastructure suitable for seismically active zones

Road and Bridge General Contractor (EPC)

For projects facing stringent schedule requirements (e. g., 48-hour weekend traffic tasks). The GAOERJI prefabricated bridge scheme can effectively reduce the human input and traffic interference compensation risk on the construction site.

Bridge prefabricated Erythritol Applicable Scenarios

Municipal infrastructure sector

for government units that need to quickly solve urban congestion and install pedestrian overpasses. Modular bridges are aesthetically pleasing and quick to install, minimizing the impact on the day-to-day operation of the city.

Bridge prefabricated Erythritol Applicable Scenarios

Mining and energy development companies

for customers who need to quickly set up heavy logistics corridors in remote areas without concrete supply conditions. The easy-to-transport and easy-to-install characteristics of prefabricated bridges are perfectly adapted to harsh environments.

Bridge prefabricated Erythritol Applicable Scenarios

Emergency rescue and traffic recovery agencies

for departments that need to get through the lifeline quickly after being damaged by natural disasters. Our modular storage scheme can realize “adjustment and installation” and restore the logistics of disaster areas in the shortest time.

Bridge prefabricated Erythritol Applicable Scenarios
bridge prefabricated raw materials/materials

bridge prefabricated raw materials/materials

bridge prefabricated raw materials/materials

bridge prefabricated raw materials/materials

The GAOERJI selects Q345B or Q420 high-quality low-alloy high-strength steel directly supplied by large steel mills to ensure that the chemical composition and mechanical properties of the steel are better than industry standards. The welding materials are certified by three parties and have extremely high impact toughness. All bolts have been treated with Dacrometal corrosion protection to ensure that the connection nodes are always fastened and not loose during the service life of the bridge.

bridge prefabricated life and after-sales service

attention

Pre-sales and after-sales service

pre-sales provide hoisting simulation and structural deepening design based on on-site working conditions; after-sales provide 24-hour remote installation guidance, and can send senior engineers to the site to supervise assembly. We provide a 20-year global quality guarantee for the main structure.

attention

Product life and description

the design service life of the main structure of the prefabricated bridge is 100 years. It is recommended to check the connecting bolts and clean the drain holes every 2 years. Thanks to the heavy anti-corrosion process, the structure is basically maintenance-free for the first 20-30 years in a conventional environment.

certificate

factory

Welcome to our Frequently Asked Questions page. We have compiled answers to common questions you may have, hoping to provide you with clear and quick solutions. If you cannot find the information you need here, please feel free to contact our customer support team.

Q: Do prefabricated bridges really need no welding for on-site assembly?
A: Yes, our system uses a full bolt connection design. All connecting holes are precisely machined by a numerical control drilling machine in the factory, and only torque wrenches are used for fastening on site, thus completely bidding farewell to the hidden dangers of fire workers and welding quality fluctuation.
Q: Can this bridge carry heavy crawler cranes through?
A: Yes. Just inform us of your maximum traffic load requirements during the design phase, and we will meet the traffic safety of super heavy equipment by strengthening the main beam section or reducing the beam spacing.
Q: If the foundation is uneven, can the prefabricated parts be installed?
A: We will provide the bearing adjustment scheme. Through the preset steel bearing or bearing pad stone, the foundation error of 20-50mm can be compensated to ensure that the prefabricated beam body is always in the designed horizontal and vertical state.
Q: What is the seismic performance of the prefabricated bridge?
A: Because the steel structure itself has good ductility, with our multi-directional energy dissipation support system, the prefabricated bridge exhibits better flexibility and reset ability than the traditional concrete bridge under the impact of seismic waves.
Q: Our country has different standards, can you do it?
A: No problem. GAOERJI engineering team is proficient in American, European and Australian standards, and we can provide calculations and certification documents that meet local regulatory requirements according to your project location.
Q: What should I do if the paint surface of the component is damaged during transportation?
E-mail*
Number
Country
Name
Your Question
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

Bridge Prefabricated Competitive Price Manufacturer 

GAOERJI prefabricated bridges are manufactured in standardized factories and assembled on site in a modular manner, which can shorten the open circuit construction time by more than 60% and significantly reduce the risk of on-site wet work. GAOERJI is a source factory integrating design and manufacturing, skipping intermediate trade links and providing you with highly competitive direct selling prices and reliable quality in line with international load standards.

bridge prefabricated

gear

All main girders and cross beams are prefabricated in the factory, and only crane lifting and bolt fastening are required on site. This model reduces the traditional several-month cast-in-place period to one week, greatly reducing traffic control time and social costs.

gear

CNC plasma cutting and robot welding process are adopted to ensure that the geometric dimension tolerance of large components is controlled within 1mm. High-precision prefabrication ensures “100 alignment of holes” during on-site assembly, avoiding hidden dangers of rework.

gear

Finite element analysis according to AASHTO LRFD standard ensures that the bridge can easily carry more than 40 tons of standard trucks and special super-heavy equipment, suitable for harsh industrial and logistics transportation environments.

gear

The steel component is immersed in a zinc liquid at 450°C to form an alloy layer with a thickness of not less than 85 microns. This physical isolation ensures that the bridge will not need to be repainted for maintenance for 30 years in a wet, salt spray environment.

gear

The bridge structure is disassembled into units conforming to standard 1333.32cm container sizes. This optimized design not only reduces the cost of cross-border shipping costs, but also solves the logistics pain point of narrow roads and ultra-long components in remote mountainous areas.

gear

there is no need for large-scale formwork support and concrete pouring on the site, which greatly reduces construction waste and pollution to surrounding water bodies and vegetation. It is the first choice for infrastructure construction in nature reserves and environmentally sensitive areas.

Technical indicatorsParameter Standardillustrate
Main beam typeSteel I-beams / Steel pipe trusses / Modular box girdersSelect the type based on span and load requirements.
Design SpecificationsAASHTO LRFD / Eurocode 3Conforms to mainstream international road and bridge design standards
Fatigue strength2 million cycles of load testingEnsure structural durability under heavy traffic.
Bridge deck materialCorrugated steel sheet / Precast concrete slab / FiberglassSupports multiple road paving schemes
Installation tolerancesMid-span deflection ≤ L/800Strictly implement the verticality specifications for high-grade bridges
Fastener gradeASTM A325 / A490 High Strength BoltsEnsure the shear and tensile strength of the node connections
Seismic fortification0.4g acceleration intensity designInfrastructure suitable for seismically active zones

Road and Bridge General Contractor (EPC)

For projects facing stringent schedule requirements (e. g., 48-hour weekend traffic tasks). The GAOERJI prefabricated bridge scheme can effectively reduce the human input and traffic interference compensation risk on the construction site.

Bridge prefabricated Erythritol Applicable Scenarios

Municipal infrastructure sector

for government units that need to quickly solve urban congestion and install pedestrian overpasses. Modular bridges are aesthetically pleasing and quick to install, minimizing the impact on the day-to-day operation of the city.

Bridge prefabricated Erythritol Applicable Scenarios

Mining and energy development companies

for customers who need to quickly set up heavy logistics corridors in remote areas without concrete supply conditions. The easy-to-transport and easy-to-install characteristics of prefabricated bridges are perfectly adapted to harsh environments.

Bridge prefabricated Erythritol Applicable Scenarios

Emergency rescue and traffic recovery agencies

for departments that need to get through the lifeline quickly after being damaged by natural disasters. Our modular storage scheme can realize “adjustment and installation” and restore the logistics of disaster areas in the shortest time.

Bridge prefabricated Erythritol Applicable Scenarios
bridge prefabricated raw materials/materials

bridge prefabricated raw materials/materials

bridge prefabricated raw materials/materials

bridge prefabricated raw materials/materials

The GAOERJI selects Q345B or Q420 high-quality low-alloy high-strength steel directly supplied by large steel mills to ensure that the chemical composition and mechanical properties of the steel are better than industry standards. The welding materials are certified by three parties and have extremely high impact toughness. All bolts have been treated with Dacrometal corrosion protection to ensure that the connection nodes are always fastened and not loose during the service life of the bridge.

bridge prefabricated life and after-sales service

attention

Pre-sales and after-sales service

attention

Product life and description

Know Us and Contact Us

*
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!
FAQ

FAQ

Q: Do prefabricated bridges really need no welding for on-site assembly?
A: Yes, our system uses a full bolt connection design. All connecting holes are precisely machined by a numerical control drilling machine in the factory, and only torque wrenches are used for fastening on site, thus completely bidding farewell to the hidden dangers of fire workers and welding quality fluctuation.
Q: Can this bridge carry heavy crawler cranes through?
A: Yes. Just inform us of your maximum traffic load requirements during the design phase, and we will meet the traffic safety of super heavy equipment by strengthening the main beam section or reducing the beam spacing.
Q: If the foundation is uneven, can the prefabricated parts be installed?
A: We will provide the bearing adjustment scheme. Through the preset steel bearing or bearing pad stone, the foundation error of 20-50mm can be compensated to ensure that the prefabricated beam body is always in the designed horizontal and vertical state.
Q: What is the seismic performance of the prefabricated bridge?
A: Because the steel structure itself has good ductility, with our multi-directional energy dissipation support system, the prefabricated bridge exhibits better flexibility and reset ability than the traditional concrete bridge under the impact of seismic waves.
Q: Our country has different standards, can you do it?
A: No problem. GAOERJI engineering team is proficient in American, European and Australian standards, and we can provide calculations and certification documents that meet local regulatory requirements according to your project location.
Q: What should I do if the paint surface of the component is damaged during transportation?
certificate

Submit Your Review

All Reviews

Loading…

Call Us
Call Us