...

Structural Steel Canopy Best Value Supplier

Made of GB Q235B/Q355B, EN S235/S275/S355, GOST St37/St52, ASTM A36/A572 grade high strength carbon steel, double anti-corrosion treatment by hot dip galvanizing and AAMA 2605 grade powder spraying, wind resistance grade up to 150mph, providing structural stability and maintenance-free cycle for more than 50 years, and providing bulk purchase.

image 82

gear

The main structure adopts ASTM A36 or A500 grade B steel with yield strength of 36,000 psi to 50,000 psi. Compared with ordinary steel, the structural bearing capacity is increased by 25%, ensuring no plastic deformation under extreme loads.

gear

Full-body hot-dip galvanizing to ASTM A123 with a zinc layer thickness of not less than 75 microns (3 mils) to effectively isolate oxidation and prevent structural rust and corrosion for more than 20 years in coastal or high humidity environments.

gear

The surface layer is sprayed with high-performance fluorocarbon or polyester powder and passes the 4000-hour salt spray test. The coating has strong adhesion, anti-ultraviolet fading performance is 3 times higher than ordinary paint, and the appearance is bright and bright for a long time.

gear

CNC laser cutting and drilling technology is adopted, and the hole position tolerance is controlled within ± 0.5mm. The full bolted design (Bolted Connections) reduces the welding workload on site by 90% and improves the installation efficiency by 40%.

gear

Optimized by FEA finite element analysis, the standard design can withstand a snow load of 40 psf and a wind load of 150 mph, fully meeting the IBC (International Building Code) structural safety requirements for hurricane-intensive areas.

gear

With high modulus structural steel characteristics, it can achieve a column-free cantilever design up to 3 meters (10 feet). While ensuring that the entrance is unobstructed, the deflection shall be strictly controlled within L/240 to eliminate the hidden danger of sagging.

Parameter itemSpecifications/Standards
Product NameStructural Steel Canopy
Main materialASTM A36 Carbon Steel / ASTM A500 Grade B/C Hollow Structural Sections
Surface treatment (Finish)Hot-dip galvanized (ASTM A123) + polyester/fluorocarbon powder coating
Yield strength36,000 psi (250 MPa) – 50,000 psi (345 MPa)
Wind load resistanceDesigned to reach speeds of up to 150 mph (240 km/h)
Snow load20 psf – 60 psf (customizable to project requirements)
Connection methodHigh-strength bolt connections (ASTM A325/A490 bolts) require no on-site welding.
Welding StandardsAWS D1.1 Structural Welding Code – Steel
Dimensional toleranceLength/Width: ±3mm; Hole Spacing: ±0.5mm
Design lifespanStructural lifespan > 50 years
Compared with aluminum alloy or wooden canopy, this Structural Steel Canopy has an absolute advantage in large span and high load applications due to its high elastic modulus and welding strength.
Structural Steel Canopy Comparison Points

shnd4

solution

Solve the hidden danger of structural corrosion in coastal and high humidity environment

Aiming at the problem of paint peeling and rusting in the traditional steel canopy within 3-5 years, we adopt a double-layer protection system that is hot-dip galvanized first and then sprayed. As a sacrificial anode to protect the steel substrate, the zinc layer can heal itself even if the coating is scratched, which completely solves the problem of metal corrosion maintenance in high salt spray areas.
solution

Addressing structural deformation and collapse risks in extreme weather

In view of the deformation problem caused by the accumulation of light canopy unable to resist typhoon or blizzard, we provide a load calculation based on PE (Professional Engineer) seal. Through the selection of high section modulus HSS steel, to ensure that in 50 years 1 the extreme wind and snow load, the structure is still rigid and stable, to ensure the safety of personnel.
solution

Solve the problems of long construction period and limited hot work on site

In view of the pain points that open flame welding is strictly prohibited and the construction period is tight in commercial building renovation projects, 100 percent of the factory prefabricated production and bolting design are adopted. After the components arrive at the site, they only need to be hoisted and bolted, without on-site painting and welding, shortening the traditional 2-week installation cycle to 3-5 days.

Project manager of commercial complex and office building

It is suitable for the main entrance and pedestrian passage of office buildings and shopping centers. The product provides a modern minimalist appearance and customized colors, which can upgrade the building facade and meet the requirements of LEED green building certification for shading and energy saving.

Structural Steel Canopy Applicable Crowd

Industrial warehousing and logistics center contractors

Suitable for loading and unloading platforms and employee entrances and exits. Structural Steel Canopy’s high impact resistance and super weather resistance, it can adapt to the frequent vehicle vibration and harsh outdoor environment in the industrial park, reducing long-term maintenance costs.

Structural Steel Canopy Applicable Crowd

Planners of educational institutions and school facilities

Applicable to the school building corridor, parents pick-up area and stadium stands. The structural design of the high safety factor is fully in line with the seismic and wind resistance specifications of the school building, providing safe outdoor activities and traffic space for students in bad weather.

Structural Steel Canopy Applicable Crowd

Heads of medical institutions and hospital infrastructure

Suitable for emergency room entrances and hospital gates. The large-span cantilever design allows ambulances to pass and park without obstacles, and the all-weather rain and snow protection function ensures that the patient transfer process is not affected by the weather and meets the functional standards of medical buildings.

Structural Steel Canopy Applicable Crowd
011

Before hoisting, the position of embedded bolts on the concrete foundation must be rechecked with the total station to ensure that the error is within ± 3mm. If deviation is found, chemical rebar planting or adjusting plate shall be used for correction. Forced installation shall not lead to structural stress concentration.

022

When the girder is hoisted by a crane, soft pads shall be applied to protect the coating at the contact point between the sling and the steel. After the cantilever beam is in place, the temporary support rod must be set immediately, and the support can not be removed until all connecting bolts are tightened to the design torque.

033

Tighten the bolts in the “initial-final” sequence using a calibrated torque wrench in accordance with ASTM A325/A490. For M20 bolts, it is recommended that the final tightening torque should reach 400-500 N · m (refer to the installation drawing for the specific value), and mark the tightening state.

044

After installation, check for minor scratches on the coating caused during transportation or installation, and use the matching zinc-rich primer and topcoat for repair. Weather-resistant silicone sealant shall be applied at all wall joints to ensure the waterproof and air tightness between the canopy and the main body of the building.

certificate

未标题 2

Welcome to our Frequently Asked Questions page. We have compiled answers to common questions you may have, hoping to provide you with clear and quick solutions. If you cannot find the information you need here, please feel free to contact our customer support team.

Q1: What is the maximum overhang length of this Structural Steel Canopy?
A: depends on the specific steel specifications and local load requirements. In general, using heavy-duty HSS steel, we can achieve a pure cantilever of 3 meters (about 10 feet) without any tie rod assistance; with tie rod assistance, the cantilever can reach more than 5 meters.
Q2: Can your products pass the local building code approval?
A: Yes. All of our designs are based on IBC (International Building Code) and ASCE 7 load standards. We can provide calculations and drawings signed by a registered structural engineer to help you successfully pass the local municipal approval.
Q3: Compared with aluminum alloy canopy, what are the main differences Structural Steel Canopy?
A: The main advantages of steel structure are strength and cost-effectiveness. In applications that require large span and high load-bearing (e. g. snow load> 30psf), the elastic modulus of steel is 3 times that of aluminum, which can achieve larger span with smaller cross-section, and the cost is usually lower than that of heavy-duty aluminum alloy systems of the same strength.
Q4: How long is the production cycle of the product?
A: The production cycle of standard projects is usually 4-6 weeks after the approval of drawings. This includes the whole process of material procurement, laser cutting, welding, hot dip galvanizing and powder coating. For urgent projects, please communicate with us in advance.
Q5: What kind of post-maintenance is required for this canopy?
A: Thanks to the hot-dip galvanizing and powder spraying process, the product is almost maintenance-free. It is recommended to conduct a visual inspection once a year to clean up the fallen leaves in the drainage trough, and rinse the surface dust with clean water to maintain a smooth appearance without repainting.
Q6: What drainage options do you offer?
A: We provide built-in drainage design. Rainwater is collected through the leading edge gutter and discharged to the ground through hollow steel columns or special downpipes to keep the appearance clean and prevent rainwater from dripping directly from the edge.
E-mail*
Number
Country
Name
Your Question
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

Structural Steel Canopy Best Value Supplier

Made of GB Q235B/Q355B, EN S235/S275/S355, GOST St37/St52, ASTM A36/A572 grade high strength carbon steel, double anti-corrosion treatment by hot dip galvanizing and AAMA 2605 grade powder spraying, wind resistance grade up to 150mph, providing structural stability and maintenance-free cycle for more than 50 years, and providing bulk purchase.

image 82

gear

The main structure adopts ASTM A36 or A500 grade B steel with yield strength of 36,000 psi to 50,000 psi. Compared with ordinary steel, the structural bearing capacity is increased by 25%, ensuring no plastic deformation under extreme loads.

gear

Full-body hot-dip galvanizing to ASTM A123 with a zinc layer thickness of not less than 75 microns (3 mils) to effectively isolate oxidation and prevent structural rust and corrosion for more than 20 years in coastal or high humidity environments.

gear

The surface layer is sprayed with high-performance fluorocarbon or polyester powder and passes the 4000-hour salt spray test. The coating has strong adhesion, anti-ultraviolet fading performance is 3 times higher than ordinary paint, and the appearance is bright and bright for a long time.

gear

CNC laser cutting and drilling technology is adopted, and the hole position tolerance is controlled within ± 0.5mm. The full bolted design (Bolted Connections) reduces the welding workload on site by 90% and improves the installation efficiency by 40%.

gear

Optimized by FEA finite element analysis, the standard design can withstand a snow load of 40 psf and a wind load of 150 mph, fully meeting the IBC (International Building Code) structural safety requirements for hurricane-intensive areas.

gear

With high modulus structural steel characteristics, it can achieve a column-free cantilever design up to 3 meters (10 feet). While ensuring that the entrance is unobstructed, the deflection shall be strictly controlled within L/240 to eliminate the hidden danger of sagging.

Parameter itemSpecifications/Standards
Product NameStructural Steel Canopy
Main materialASTM A36 Carbon Steel / ASTM A500 Grade B/C Hollow Structural Sections
Surface treatment (Finish)Hot-dip galvanized (ASTM A123) + polyester/fluorocarbon powder coating
Yield strength36,000 psi (250 MPa) – 50,000 psi (345 MPa)
Wind load resistanceDesigned to reach speeds of up to 150 mph (240 km/h)
Snow load20 psf – 60 psf (customizable to project requirements)
Connection methodHigh-strength bolt connections (ASTM A325/A490 bolts) require no on-site welding.
Welding StandardsAWS D1.1 Structural Welding Code – Steel
Dimensional toleranceLength/Width: ±3mm; Hole Spacing: ±0.5mm
Design lifespanStructural lifespan > 50 years

Structural Steel Canopy Comparison Points

Structural Steel Canopy Comparison Points

solution
Solve the hidden danger of structural corrosion in coastal and high humidity environment
Aiming at the problem of paint peeling and rusting in the traditional steel canopy within 3-5 years, we adopt a double-layer protection system that is hot-dip galvanized first and then sprayed. As a sacrificial anode to protect the steel substrate, the zinc layer can heal itself even if the coating is scratched, which completely solves the problem of metal corrosion maintenance in high salt spray areas.
solution
Addressing structural deformation and collapse risks in extreme weather
In view of the deformation problem caused by the accumulation of light canopy unable to resist typhoon or blizzard, we provide a load calculation based on PE (Professional Engineer) seal. Through the selection of high section modulus HSS steel, to ensure that in 50 years 1 the extreme wind and snow load, the structure is still rigid and stable, to ensure the safety of personnel.
solution
Solve the problems of long construction period and limited hot work on site
In view of the pain points that open flame welding is strictly prohibited and the construction period is tight in commercial building renovation projects, 100 percent of the factory prefabricated production and bolting design are adopted. After the components arrive at the site, they only need to be hoisted and bolted, without on-site painting and welding, shortening the traditional 2-week installation cycle to 3-5 days.

It is suitable for the main entrance and pedestrian passage of office buildings and shopping centers. The product provides a modern minimalist appearance and customized colors, which can upgrade the building facade and meet the requirements of LEED green building certification for shading and energy saving.

Structural Steel Canopy Applicable Crowd

Suitable for loading and unloading platforms and employee entrances and exits. Structural Steel Canopy’s high impact resistance and super weather resistance, it can adapt to the frequent vehicle vibration and harsh outdoor environment in the industrial park, reducing long-term maintenance costs.

Structural Steel Canopy Applicable Crowd

Applicable to the school building corridor, parents pick-up area and stadium stands. The structural design of the high safety factor is fully in line with the seismic and wind resistance specifications of the school building, providing safe outdoor activities and traffic space for students in bad weather.

Structural Steel Canopy Applicable Crowd

Suitable for emergency room entrances and hospital gates. The large-span cantilever design allows ambulances to pass and park without obstacles, and the all-weather rain and snow protection function ensures that the patient transfer process is not affected by the weather and meets the functional standards of medical buildings.

Structural Steel Canopy Applicable Crowd
011

Before hoisting, the position of embedded bolts on the concrete foundation must be rechecked with the total station to ensure that the error is within ± 3mm. If deviation is found, chemical rebar planting or adjusting plate shall be used for correction. Forced installation shall not lead to structural stress concentration.

022

When the girder is hoisted by a crane, soft pads shall be applied to protect the coating at the contact point between the sling and the steel. After the cantilever beam is in place, the temporary support rod must be set immediately, and the support can not be removed until all connecting bolts are tightened to the design torque.

033

Tighten the bolts in the “initial-final” sequence using a calibrated torque wrench in accordance with ASTM A325/A490. For M20 bolts, it is recommended that the final tightening torque should reach 400-500 N · m (refer to the installation drawing for the specific value), and mark the tightening state.

044

After installation, check for minor scratches on the coating caused during transportation or installation, and use the matching zinc-rich primer and topcoat for repair. Weather-resistant silicone sealant shall be applied at all wall joints to ensure the waterproof and air tightness between the canopy and the main body of the building.

Know Us and Contact Us

*
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

FAQ

Q1: What is the maximum overhang length of this Structural Steel Canopy?
A: depends on the specific steel specifications and local load requirements. In general, using heavy-duty HSS steel, we can achieve a pure cantilever of 3 meters (about 10 feet) without any tie rod assistance; with tie rod assistance, the cantilever can reach more than 5 meters.
Q2: Can your products pass the local building code approval?
A: Yes. All of our designs are based on IBC (International Building Code) and ASCE 7 load standards. We can provide calculations and drawings signed by a registered structural engineer to help you successfully pass the local municipal approval.
Q3: Compared with aluminum alloy canopy, what are the main differences Structural Steel Canopy?
A: The main advantages of steel structure are strength and cost-effectiveness. In applications that require large span and high load-bearing (e. g. snow load> 30psf), the elastic modulus of steel is 3 times that of aluminum, which can achieve larger span with smaller cross-section, and the cost is usually lower than that of heavy-duty aluminum alloy systems of the same strength.
Q4: How long is the production cycle of the product?
A: The production cycle of standard projects is usually 4-6 weeks after the approval of drawings. This includes the whole process of material procurement, laser cutting, welding, hot dip galvanizing and powder coating. For urgent projects, please communicate with us in advance.
Q5: What kind of post-maintenance is required for this canopy?
A: Thanks to the hot-dip galvanizing and powder spraying process, the product is almost maintenance-free. It is recommended to conduct a visual inspection once a year to clean up the fallen leaves in the drainage trough, and rinse the surface dust with clean water to maintain a smooth appearance without repainting.
Q6: What drainage options do you offer?
A: We provide built-in drainage design. Rainwater is collected through the leading edge gutter and discharged to the ground through hollow steel columns or special downpipes to keep the appearance clean and prevent rainwater from dripping directly from the edge.
certificate

Call Us
Call Us
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.