Steel Structure House Building China Professional Manufacturer

GAOERJI offers high-strength steel-framed residential building solutions that integrate design, manufacturing, and global installation support, delivering exceptional seismic performance and rapid project delivery. As a source-manufacturing factory with many years of industry expertise, GAOERJI has implemented vertically integrated production to eliminate intermediary costs, enabling it to offer developers highly competitive ex-factory prices and rigorous, closed-loop quality control.

Q355B low-alloy high-strength steel Material
Over 50 years Service life
Will not collapse under intensity 8. Seismic resistance level
50% shorter than traditional buildings Construction speed
sandblasting plus epoxy zinc-rich paint Surface treatment
36 m without column space Maximum span
more than 2.5 hours Fire limit
0.5 kN per square meter Roof load
Steel structure house building for people

gear

all the building components are precision prefabricated in the factory and only need to be bolted after arriving at the site, which can shorten the construction period by more than half compared with traditional concrete buildings and ensure the quick return of funds for the project.

gear

the use of high-strength lightweight steel as the main frame, with excellent ductility and energy absorption capacity, under the action of seismic load only deformation and not easy to collapse, to ensure the safety of residents.

gear

the self-weight of the steel structure is only about 1/3 of that of the traditional brick-concrete structure, which greatly reduces the requirements for the bearing capacity of the foundation, and can save significant earthwork and pile-based engineering costs under complex geological conditions.

gear

due to the high strength of steel, the cross-sectional size of beams and columns is much smaller than that of concrete components, which can provide greater net use space under the same construction area and significantly improve the unit sales value of real estate developers.

gear

the steel structure belongs to the category of green building, the main structure material recovery rate is high, and the construction site has no wet operation, low noise, no construction waste pollution, in line with international green investment standards.

gear

components after shot blasting and multi-layer high-performance coating treatment, the film thickness of more than 120 microns, in all kinds of climate environment can maintain structural stability, reduce the later maintenance costs.

Parameter nameTechnical Specifications and Standards
Main structural materialQ355B or Q235B welded H-beams
SubstructureC-shaped steel, Z-shaped steel and channel steel supports
Connection methodHigh-strength large hexagonal bolt connection
Wall systemGlass wool sandwich panels or lightweight composite wall panels
Wind pressure resistance ratingIt can withstand typhoons of level 12 or higher.
Anti-corrosion treatmentHot-dip galvanizing or three-layer high-performance anti-rust paint
Floor decking materialGalvanized profiled steel sheet plus cast-in-place concrete
Sound insulation effectThe airborne sound insulation of the wall is greater than 45 decibels.
GAOERJI steel structure residential buildings introduce high-precision laser cutting and automatic submerged arc welding process at the factory end, and the dimensional tolerance of components is controlled within 1mm, far exceeding the industry average. Compared with the general trade scheme on the market, we not only provide materials, but also complete set of deepening drawings and on-site installation guidance of overseas engineers to ensure the certainty of project delivery.
Steel structure house building for people

solution

Overcoming the hidden danger of building water leakage

The bite-type roofing system and customized sealing accessories developed by GAOERJI solve the long-term problem of water seepage at the joints of traditional steel structure houses.
solution

Elimination of installation accuracy deviation

in view of the problem that the construction party is worried about on-site assembly, pre-assembly inspection before leaving the factory is GAOERJI implemented, thus solving the problem of installation rework caused by off-site processing.
solution

Optimize extreme weather tolerance

For coastal or high salt spray areas, the GAOERJI provides special heavy-duty anti-corrosion coating solutions to solve the problem that ordinary steel structures are easy to rust and affect structural safety.

Real estate developers

It is suitable for large-scale residential development projects that pursue rapid capital turnover, and use the efficient construction advantages of steel structures to shorten the cycle from land acquisition to opening.

Steel structure house building for people

Government housing departments

provide standardized housing modules that meet high seismic standards and can be quickly replicated on a large scale for affordable housing or post-disaster reconstruction projects.

Steel structure house building for people

Investors in the industrial park

It is suitable for supporting dormitories and office supporting buildings around large factories to meet the dual needs of rapid production and high-quality living environment.

Steel structure house building for people

Tourism real estate operators

It is suitable for the construction of boutique hotels or villas in ecological protection areas, reducing the damage to the natural landscape caused by on-site civil work, and realizing green construction.

Steel structure house building for people
011

before construction, the foundation shall be poured according to the anchor bolt layout provided by the GAOERJI, and the error between axis and elevation shall be strictly checked.

022

hoisting steel column and main girder in turn, preliminarily fixing with high-strength bolts, and final screwing after the whole span structure is corrected.

033

when installing wall panels and roof panels, ensure that the overlapping direction is away from the local prevailing wind direction, and use special waterproof gaskets to fix them.

044

after the delivery of the building, the water accumulation in the drainage channel should be checked regularly, and the coating of key nodes should be observed every 5 years to ensure long-term rust prevention.

certificate

factory

Welcome to our Frequently Asked Questions page. We have compiled answers to common questions you may have, hoping to provide you with clear and quick solutions. If you cannot find the information you need here, please feel free to contact our customer support team.

How is the thermal insulation performance of steel structure residence?
By configuring high-performance glass wool or polyurethane sandwich wall panels, the thermal resistance value is much higher than that of ordinary brick walls.
Is GAOERJI responsible for shipping logistics?
We provide global logistics services including professional container loading to ensure the arrival of components without damage.
Is a steel house more expensive than a concrete house?
The material alone may be slightly higher, but the total cost is more advantageous when combined with the interest savings from lower base costs and shorter durations.
How many floors can this house be built?
Depending on the design capabilities of the GAOERJI, it is usually possible to achieve 1 to 6 layers of pure steel structure residential or higher steel frame support system.
Do you provide installation team to overseas site?
We send experienced technical engineers to the site to supervise, guide and systematically train local workers.
steel structure housing easy to rust?
The main frame has been hot-dip galvanized or multi-layer epoxy anti-rust treatment, which can ensure that the structure will not be corroded for 50 years under normal maintenance.
E-mail*
Number
Country
Name
Your Question
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

Steel Structure House Building China Professional Manufacturer

GAOERJI offers high-strength steel-framed residential building solutions that integrate design, manufacturing, and global installation support, delivering exceptional seismic performance and rapid project delivery. As a source-manufacturing factory with many years of industry expertise, GAOERJI has implemented vertically integrated production to eliminate intermediary costs, enabling it to offer developers highly competitive ex-factory prices and rigorous, closed-loop quality control.

PDC Core Drill Bits

gear

all the building components are precision prefabricated in the factory and only need to be bolted after arriving at the site, which can shorten the construction period by more than half compared with traditional concrete buildings and ensure the quick return of funds for the project.

gear

the use of high-strength lightweight steel as the main frame, with excellent ductility and energy absorption capacity, under the action of seismic load only deformation and not easy to collapse, to ensure the safety of residents.

gear

the self-weight of the steel structure is only about 1/3 of that of the traditional brick-concrete structure, which greatly reduces the requirements for the bearing capacity of the foundation, and can save significant earthwork and pile-based engineering costs under complex geological conditions.

gear

due to the high strength of steel, the cross-sectional size of beams and columns is much smaller than that of concrete components, which can provide greater net use space under the same construction area and significantly improve the unit sales value of real estate developers.

gear

the steel structure belongs to the category of green building, the main structure material recovery rate is high, and the construction site has no wet operation, low noise, no construction waste pollution, in line with international green investment standards.

gear

components after shot blasting and multi-layer high-performance coating treatment, the film thickness of more than 120 microns, in all kinds of climate environment can maintain structural stability, reduce the later maintenance costs.

Parameter nameTechnical Specifications and Standards
Main structural materialQ355B or Q235B welded H-beams
SubstructureC-shaped steel, Z-shaped steel and channel steel supports
Connection methodHigh-strength large hexagonal bolt connection
Wall systemGlass wool sandwich panels or lightweight composite wall panels
Wind pressure resistance ratingIt can withstand typhoons of level 12 or higher.
Anti-corrosion treatmentHot-dip galvanizing or three-layer high-performance anti-rust paint
Floor decking materialGalvanized profiled steel sheet plus cast-in-place concrete
Sound insulation effectThe airborne sound insulation of the wall is greater than 45 decibels.

steel structure house building comparison point

Steel structure house building for people

solution
Overcoming the hidden danger of building water leakage
The bite-type roofing system and customized sealing accessories developed by GAOERJI solve the long-term problem of water seepage at the joints of traditional steel structure houses.
solution
Elimination of installation accuracy deviation
in view of the problem that the construction party is worried about on-site assembly, pre-assembly inspection before leaving the factory is GAOERJI implemented, thus solving the problem of installation rework caused by off-site processing.
solution
Optimize extreme weather tolerance
For coastal or high salt spray areas, the GAOERJI provides special heavy-duty anti-corrosion coating solutions to solve the problem that ordinary steel structures are easy to rust and affect structural safety.

Real estate developers

It is suitable for large-scale residential development projects that pursue rapid capital turnover, and use the efficient construction advantages of steel structures to shorten the cycle from land acquisition to opening.

Steel structure house building for people

Government housing departments

provide standardized housing modules that meet high seismic standards and can be quickly replicated on a large scale for affordable housing or post-disaster reconstruction projects.

Steel structure house building for people

Investors in the industrial park

It is suitable for supporting dormitories and office supporting buildings around large factories to meet the dual needs of rapid production and high-quality living environment.

Steel structure house building for people

Tourism real estate operators

It is suitable for the construction of boutique hotels or villas in ecological protection areas, reducing the damage to the natural landscape caused by on-site civil work, and realizing green construction.

Steel structure house building for people
011

before construction, the foundation shall be poured according to the anchor bolt layout provided by the GAOERJI, and the error between axis and elevation shall be strictly checked.

022

hoisting steel column and main girder in turn, preliminarily fixing with high-strength bolts, and final screwing after the whole span structure is corrected.

033

when installing wall panels and roof panels, ensure that the overlapping direction is away from the local prevailing wind direction, and use special waterproof gaskets to fix them.

044

after the delivery of the building, the water accumulation in the drainage channel should be checked regularly, and the coating of key nodes should be observed every 5 years to ensure long-term rust prevention.

Know Us and Contact Us

*
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!
FAQ

FAQ

How is the thermal insulation performance of steel structure residence?
By configuring high-performance glass wool or polyurethane sandwich wall panels, the thermal resistance value is much higher than that of ordinary brick walls.
Is GAOERJI responsible for shipping logistics?
We provide global logistics services including professional container loading to ensure the arrival of components without damage.
Is a steel house more expensive than a concrete house?
The material alone may be slightly higher, but the total cost is more advantageous when combined with the interest savings from lower base costs and shorter durations.
How many floors can this house be built?
Depending on the design capabilities of the GAOERJI, it is usually possible to achieve 1 to 6 layers of pure steel structure residential or higher steel frame support system.
Do you provide installation team to overseas site?
We send experienced technical engineers to the site to supervise, guide and systematically train local workers.
steel structure housing easy to rust?
The main frame has been hot-dip galvanized or multi-layer epoxy anti-rust treatment, which can ensure that the structure will not be corroded for 50 years under normal maintenance.
certificate

Call Us
Call Us