{"id":14450,"date":"2026-06-30T11:16:10","date_gmt":"2026-06-30T03:16:10","guid":{"rendered":"https:\/\/www.wedospace.com\/?p=14450"},"modified":"2026-06-30T11:16:12","modified_gmt":"2026-06-30T03:16:12","slug":"fabricated-steel-structures-proven-fabrication-methods","status":"publish","type":"post","link":"https:\/\/www.wedospace.com\/fr\/fabricated-steel-structures-proven-fabrication-methods\/","title":{"rendered":"Fabricated Steel Structures: Proven Fabrication Methods"},"content":{"rendered":"<div class=\"wp-block-themepark-block-themepark-wright content-super-p  blog-jiange\" style=\"font-size:17px;line-height:28px;color:#211c1c;padding:10px 20px;\">\n<div class=\"wp-block-column\">\n<p class=\"wp-block-paragraph\">Fabricated steel structures are pre-engineered load-bearing frameworks created by cutting, shaping, and welding standard steel sections into custom configurations according to exact architectural and engineering specifications. The successful fabrication of steel structures requires strict control over CNC machining tolerances and welding heat inputs to meet AWS D1.1 and AISC standards. Many civil engineers and industrial investors face severe budget overruns due to misaligned connection plates or undetected weld defects that only surface during on-site erection. We detail the exact quality control protocols, advanced diagnostic tools, and the proprietary FAB-Q engineering framework that eliminate rework and guarantee structural integrity before any steel member leaves the shop floor.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16-1024x576.jpg\" alt=\"Display A Chart Of The Fab-Q Pyramid, Comprising Four Levels: Fit-Up, Arc Control, Blasting, And Ndt.\" class=\"wp-image-14438\" srcset=\"https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16-1024x576.jpg 1024w, https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16-300x169.jpg 300w, https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16-768x432.jpg 768w, https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16-1536x864.jpg 1536w, https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16-18x10.jpg 18w, https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16.jpg 1672w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h1 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"The_%E2%80%9CFAB-Q%E2%80%9D_Pyramid_A_Proven_Framework_for_Steel_Fabrication\"><\/span>The \u201cFAB-Q\u201d Pyramid: A Proven Framework for Steel Fabrication<span class=\"ez-toc-section-end\"><\/span><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Evaluating the reliability of fabricated steel structures requires a systematic approach rather than visual inspection alone. The FAB-Q Pyramid breaks down the fabrication process into four measurable engineering layers.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Foundation_F_Fit-Up_Tolerances_And_CNC_Precision\"><\/span>Foundation (F): Fit-Up Tolerances And CNC Precision<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Precision fit-up dictates the final structural integrity of the assembly. Gap variations exceeding 1.5mm force welders to increase root openings, drastically altering the calculated heat input and residual stress of the joint. Modern steel fabrication facilities utilize multi-axis CNC plasma cutters and robotic drill lines to process I-beams, H-columns, and gusset plates. These machines strictly read DSTV files directly from the engineering software, bypassing manual layout errors. QA\/QC inspectors reject assemblies that fail root gap measurements before a single arc is struck.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Core_A_Arc_Thermal_Control_And_AWS_D11_Compliance\"><\/span>Core (A): Arc Thermal Control And AWS D1.1 Compliance<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Weld metal mechanical properties degrade when thermal cycles are mismanaged. The fabrication of steel structures relies heavily on Submerged Arc Welding (SAW) for thick flanges and Gas Metal Arc Welding (GMAW) for web attachments. Engineers dictate exact preheat temperatures, interpass temperatures, and travel speeds in the Welding Procedure Specification (WPS). Deviating from these parameters alters the microstructural cooling rate of the steel, leading to a brittle martensitic heat-affected zone (HAZ).<\/p>\n\n\n\n<iframe loading=\"lazy\" width=\"560\" height=\"315\" src=\"https:\/\/www.youtube.com\/embed\/GqVLWxiqKdo?si=Eh-4JPB5uMuVOgoa\" title=\"Lecteur vid\u00e9o YouTube\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Protection_B_Blasting_Profiles_And_Coating_Adhesion\"><\/span>Protection (B): Blasting Profiles And Coating Adhesion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Corrosion resistance entirely depends on the surface profile created before paint application. Steel members are passed through automated shot blasting machines to achieve an SA 2.5 cleanliness rating and a specific angular surface profile (typically 40-75 microns). Applying zinc-rich epoxy primers over a smooth or contaminated surface guarantees premature delamination. Quality assurance teams use replica tape (Press-O-Film) to physically measure the blast profile depth immediately prior to coating.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Apex_Q_Advanced_NDT_Verification\"><\/span>Apex (Q): Advanced NDT Verification<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Volumetric testing proves the internal soundness of critical connections. Surface inspections like Magnetic Particle Testing (MT) or Dye Penetrant Testing (PT) only reveal superficial flaws. For full-penetration butt welds in heavy fabricated steel structures, inspectors deploy Phased Array Ultrasonic Testing (PAUT). PAUT records cross-sectional data of the weld seam in real-time, instantly identifying lack of fusion, slag inclusions, or internal porosity that standard radiography might miss due to orientation.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Expert_QAQC_Alert_The_Delayed_Hydrogen_Cracking_Trap\"><\/span>Expert QA\/QC Alert: The Delayed Hydrogen Cracking Trap<span class=\"ez-toc-section-end\"><\/span><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Delayed hydrogen cracking causes catastrophic field failures in high-strength fabricated steel structures (such as ASTM A992 or Q355). This micro-cracking occurs when diffusible hydrogen gets trapped in a rapidly cooled weld joint. The structural failure does not happen immediately; it often initiates 48 to 72 hours after the weld has cooled to ambient temperature.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Inexperienced fabrication shops perform NDT inspections immediately after welding to expedite shipping. Engineers must mandate a strict 48-hour holding period before conducting ultrasonic testing on highly restrained joints or high-tensile steel components. Implementing hydrogen-controlled consumables (H4-rated electrodes) and maintaining continuous preheat during the entire welding cycle completely neutralize this risk.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Comparison_Immediate_NDT_vs_48-Hour_Delayed_NDT_for_High-Strength_Steel\"><\/span>Comparison: Immediate NDT vs. 48-Hour Delayed NDT for High-Strength Steel<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Comparison Aspect<\/td><td>Immediate NDT<\/td><td>48-Hour Delayed NDT<\/td><\/tr><tr><td><strong>Timing of Inspection<\/strong><\/td><td>Performed immediately after welding.<\/td><td>Conducted after a strict 48-hour holding period once the weld cools to ambient temperature.<\/td><\/tr><tr><td><strong>Typical Practitioner \/ Motivation<\/strong><\/td><td>Done by inexperienced fabrication shops to expedite shipping.<\/td><td>Mandated by engineers to ensure the structural integrity of critical components.<\/td><\/tr><tr><td><strong>Detection of Delayed Hydrogen Cracking<\/strong><\/td><td><strong>Fails to detect<\/strong>&nbsp;micro-cracking (diffusible hydrogen cracks typically initiate 48-72 hours later).<\/td><td><strong>Successfully detects<\/strong>&nbsp;delayed hydrogen cracking after the critical initiation window has passed.<\/td><\/tr><tr><td><strong>Outcome \/ Consequence<\/strong><\/td><td>Leads to a high risk of catastrophic field failures due to undetected trapped hydrogen.<\/td><td>Ensures internal soundness of the weld and prevents catastrophic structural failures.<\/td><\/tr><tr><td><strong>Suitability for High-Strength Steel<\/strong><\/td><td>Unsafe and not recommended for high-tensile steel components (e.g., ASTM A992 or Q355).<\/td><td>Mandatory for highly restrained joints and high-tensile steel fabricated structures.<\/td><\/tr><tr><td><strong>Associated Preventative Measures<\/strong><\/td><td>Often bypasses proper thermal controls in a rush to ship.<\/td><td>Complemented by maintaining continuous preheat and using hydrogen-controlled (H4-rated) consumables.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h1 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Next-Gen_Fabrication_Virtual_Trial_Assembly_via_BIM_Level_400\"><\/span>Next-Gen Fabrication: Virtual Trial Assembly via BIM Level 400<span class=\"ez-toc-section-end\"><\/span><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Physical trial assemblies in the yard consume massive amounts of labor and crane hours. Top-tier fabricators now execute Virtual Trial Assembly (VTA) using Level 400 Building Information Modeling (BIM) coupled with 3D laser scanning. After a major structural component is welded, technicians scan the physical member to create an exact digital twin with a sub-millimeter point cloud. Software aligns this point cloud against the original 3D CAD model. Any bolt hole misalignment or flange distortion is identified and corrected in the factory, achieving a zero-rework rate during field erection.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Real-World_Data_15_Erection_Time_Reduction_in_Industrial_Plant_Expansion\"><\/span>Real-World Data: 15% Erection Time Reduction in Industrial Plant Expansion<span class=\"ez-toc-section-end\"><\/span><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">Applying stringent factory controls directly impacts site execution speed. During a recent 4,500-ton petrochemical rack expansion, the investor mandated the FAB-Q protocol and VTA laser scanning for all heavy columns and trusses.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Total connections verified in-shop: 12,400<\/li>\n\n\n\n<li>Site modification rate: 0.2% (Compared to the industry average of 3-5%)<\/li>\n\n\n\n<li>Crane usage reduction: Saved 120 rental hours<\/li>\n\n\n\n<li>Schedule impact: Erection finished 18 days ahead of the 120-day baseline schedule.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The data proves that shifting the quality control burden from the construction site to the fabrication shop lowers overall project risk and capital expenditure.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions_People_Also_Ask\"><\/span>Frequently Asked Questions (People Also Ask)<span class=\"ez-toc-section-end\"><\/span><\/h1>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_Is_A_Fabricated_Steel_Structure\"><\/span>What Is A Fabricated Steel Structure?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A fabricated steel structure is a network of structural steel components (beams, columns, trusses) that have been precisely cut, drilled, welded, and coated in an industrial manufacturing facility before being transported to a construction site for final assembly.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_Are_The_Primary_Methods_For_The_Fabrication_Of_Steel_Structures\"><\/span>What Are The Primary Methods For The Fabrication Of Steel Structures?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The core methods include CNC thermal cutting (plasma\/oxy-fuel), mechanical forming (rolling and bending), automated welding (SAW, GMAW, FCAW), and surface treatment (shot blasting and protective coating).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_Is_Fit-Up_Tolerance_Critical_In_Fabricated_Steel_Structures\"><\/span>Why Is Fit-Up Tolerance Critical In Fabricated Steel Structures?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Fit-up tolerance determines the gap between two steel pieces before welding. Excessive gaps alter the required weld volume, increasing heat input, which causes severe distortion and degrades the metallurgical strength of the joint.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_Do_Engineers_Test_The_Quality_Of_Fabricated_Steel_Structures\"><\/span>How Do Engineers Test The Quality Of Fabricated Steel Structures?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Quality is verified through Non-Destructive Testing (NDT). Methods include Visual Testing (VT), Magnetic Particle Testing (MT) for surface cracks, and Ultrasonic Testing (UT) or Radiographic Testing (RT) for internal weld defects.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_Causes_Delayed_Cracking_In_Steel_Fabrication\"><\/span>What Causes Delayed Cracking In Steel Fabrication?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Delayed cracking is primarily caused by trapped diffusible hydrogen in the weld zone, high residual stress, and rapid cooling rates in high-strength or thick-walled steel structures. It can be prevented by proper preheating and using low-hydrogen electrodes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_Is_The_Difference_Between_Steel_Manufacturing_And_Steel_Fabrication\"><\/span>What Is The Difference Between Steel Manufacturing And Steel Fabrication?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Steel manufacturing is the process of creating raw steel from iron ore or scrap metal and rolling it into standard shapes (like I-beams). Steel fabrication takes those raw commercial shapes and cuts, drills, and welds them into specific parts for a building or bridge.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_Does_BIM_Improve_The_Fabrication_Of_Steel_Structures\"><\/span>How Does BIM Improve The Fabrication Of Steel Structures?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Building Information Modeling (BIM) generates highly detailed 3D models of the structure. It automatically extracts exact CNC machine codes (DSTV files) for cutting and drilling, eliminating human measurement errors and ensuring perfect part-to-part fitment.<\/p>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":4,"featured_media":14438,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"themepark_post_bcolor":"#f5f5f5","themepark_post_width":"1022px","themepark_post_img":"","themepark_post_img_po":"left","themepark_post_img_re":false,"themepark_post_img_cover":false,"themepark_post_img_fixed":false,"themepark_post_hide_title":false,"themepark_post_main_b":"","themepark_post_main_p":100,"themepark_paddingblock":false,"footnotes":""},"categories":[28],"tags":[],"class_list":["post-14450","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-article"],"metadata":{"_edit_lock":["1783419345:4"],"_thumbnail_id":["14438"],"rank_math_schema_BlogPosting":["a:9:{s:8:\"headline\";s:11:\"%seo_title%\";s:11:\"description\";s:17:\"%seo_description%\";s:13:\"datePublished\";s:20:\"%date(Y-m-dTH:i:sP)%\";s:12:\"dateModified\";s:24:\"%modified(Y-m-dTH:i:sP)%\";s:8:\"keywords\";s:10:\"%keywords%\";s:5:\"image\";a:2:{s:5:\"@type\";s:11:\"ImageObject\";s:3:\"url\";s:16:\"%post_thumbnail%\";}s:6:\"author\";a:2:{s:5:\"@type\";s:6:\"Person\";s:4:\"name\";s:6:\"%name%\";}s:5:\"@type\";s:11:\"BlogPosting\";s:8:\"metadata\";a:3:{s:5:\"title\";s:7:\"Article\";s:4:\"type\";s:8:\"template\";s:9:\"isPrimary\";b:1;}}"],"rank_math_schema_VideoObject":["a:12:{s:5:\"@type\";s:11:\"VideoObject\";s:8:\"metadata\";a:8:{s:5:\"title\";s:5:\"Video\";s:4:\"type\";s:8:\"template\";s:9:\"shortcode\";s:15:\"s-6a4334d2b0a4e\";s:9:\"isPrimary\";b:1;s:23:\"reviewLocationShortcode\";s:24:\"[rank_math_rich_snippet]\";s:8:\"category\";s:12:\"%categories%\";s:4:\"tags\";s:6:\"%tags%\";s:15:\"isAutoGenerated\";b:1;}s:4:\"name\";s:60:\"Arc Magazine Master Class: The Submerged Arc Welding Process\";s:11:\"description\";s:115:\"In-depth tutorials on various welding processes and techniques from members of the Lincoln Electric Welding School.\";s:10:\"uploadDate\";s:25:\"2017-11-28T06:19:30-08:00\";s:12:\"thumbnailUrl\";s:91:\"https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/arc-magazine-master-class-the-su-1.jpg\";s:8:\"embedUrl\";s:41:\"https:\/\/www.youtube.com\/embed\/GqVLWxiqKdo\";s:10:\"contentUrl\";s:0:\"\";s:8:\"duration\";s:7:\"PT5M19S\";s:5:\"width\";s:4:\"1280\";s:6:\"height\";s:3:\"720\";s:16:\"isFamilyFriendly\";b:1;}"],"rank_math_seo_score":["12"],"rank_math_primary_category":["28"],"_edit_last":["4"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-device-target":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-word_count_limit":["0"],"_ez-toc-position-specific":[""],"product_title":[""],"_product_title":["field_696dcb32bdf4a"],"product_description":[""],"_product_description":["field_696dcb5bbdf4b"],"product_parametertitle":[""],"_product_parametertitle":["field_696dcb64bdf4c"],"product_parameter1":[""],"_product_parameter1":["field_696dcb6bbdf4d"],"product_parameter2":[""],"_product_parameter2":["field_696dcb77bdf4e"],"product_parameter3":[""],"_product_parameter3":["field_696dcb7bbdf4f"],"product_parameter4":[""],"_product_parameter4":["field_698bf447ce749"],"product_parameter5":[""],"_product_parameter5":["field_698bf44dce74a"],"product_parameter6":[""],"_product_parameter6":["field_698bf456ce74b"],"product_parameter7":[""],"_product_parameter7":["field_698bf45dce74c"],"product_parameter8":[""],"_product_parameter8":["field_698bf460ce74d"],"product_parameter9":[""],"_product_parameter9":["field_698bf464ce74e"],"parameter_describ":[""],"_parameter_describ":["field_698bf496ce756"],"product_parameter_description1":[""],"_product_parameter_description1":["field_696dcb80bdf50"],"product_parameter_description2":[""],"_product_parameter_description2":["field_696dcb87bdf51"],"product_parameter_description3":[""],"_product_parameter_description3":["field_696dcb8bbdf52"],"product_parameter_description4":[""],"_product_parameter_description4":["field_698bf473ce74f"],"product_parameter_description5":[""],"_product_parameter_description5":["field_698bf477ce750"],"product_parameter_description6":[""],"_product_parameter_description6":["field_698bf47dce751"],"product_parameter_description7":[""],"_product_parameter_description7":["field_698bf480ce752"],"product_parameter_description8":[""],"_product_parameter_description8":["field_698bf484ce753"],"product_parameter_description9":[""],"_product_parameter_description9":["field_698bf48ace754"],"characteristics_tittle":[""],"_characteristics_tittle":["field_696dcb93bdf53"],"characteristics_tittle1":[""],"_characteristics_tittle1":["field_696dcb9abdf54"],"characteristics_tittle2":[""],"_characteristics_tittle2":["field_696dcb9dbdf55"],"characteristics_tittle3":[""],"_characteristics_tittle3":["field_696dcba0bdf56"],"characteristics_tittle4":[""],"_characteristics_tittle4":["field_696dcba3bdf57"],"characteristics_tittle5":[""],"_characteristics_tittle5":["field_696dcbb1bdf58"],"characteristics_tittle6":[""],"_characteristics_tittle6":["field_696dcbc0bdf59"],"characteristics_description1":[""],"_characteristics_description1":["field_696dcbc3bdf5a"],"characteristics_description2":[""],"_characteristics_description2":["field_696dcbcdbdf5b"],"characteristics_description3":[""],"_characteristics_description3":["field_696dcbd2bdf5c"],"characteristics_description4":[""],"_characteristics_description4":["field_696dcbd6bdf5d"],"characteristics_description5":[""],"_characteristics_description5":["field_696dcbdabdf5e"],"characteristics_description6":[""],"_characteristics_description6":["field_696dcbdebdf5f"],"detailed_specifications_table":[""],"_detailed_specifications_table":["field_696deea21804d"],"comparison_points_tittle":[""],"_comparison_points_tittle":["field_696dcbeabdf60"],"comparison_points_description":[""],"_comparison_points_description":["field_696dcbf3bdf61"],"comparison_points_tittle1":[""],"_comparison_points_tittle1":["field_696dcbfebdf62"],"comparison_points_tittle2":[""],"_comparison_points_tittle2":["field_696dcc05bdf63"],"comparison_points_tittle3":[""],"_comparison_points_tittle3":["field_696dcc0dbdf64"],"comparison_points_description1":[""],"_comparison_points_description1":["field_696dcc13bdf65"],"comparison_points_description2":[""],"_comparison_points_description2":["field_696dcc19bdf66"],"comparison_points_description3":[""],"_comparison_points_description3":["field_696dcc1dbdf67"],"application_title":[""],"_application_title":["field_696dcc20bdf68"],"application_title1":[""],"_application_title1":["field_696dcc2bbdf69"],"application_title2":[""],"_application_title2":["field_696dcc31bdf6a"],"application_title3":[""],"_application_title3":["field_696dcc34bdf6b"],"application_title4":[""],"_application_title4":["field_696dcc37bdf6c"],"application_describe1":[""],"_application_describe1":["field_696dcc3abdf6d"],"application_describe2":[""],"_application_describe2":["field_696dcc41bdf6e"],"application_describe3":[""],"_application_describe3":["field_696dcc45bdf6f"],"application_describe4":[""],"_application_describe4":["field_696dcc48bdf70"],"instruction_title":[""],"_instruction_title":["field_696dcc53bdf71"],"instruction_title1":[""],"_instruction_title1":["field_696dcc57bdf72"],"instruction_title2":[""],"_instruction_title2":["field_696dcc5fbdf73"],"instruction_title3":[""],"_instruction_title3":["field_696dcc62bdf74"],"instruction_title4":[""],"_instruction_title4":["field_696dcc65bdf75"],"instruction_describe1":[""],"_instruction_describe1":["field_696dcc71bdf76"],"instruction_describe2":[""],"_instruction_describe2":["field_696dcc7bbdf77"],"instruction_describe3":[""],"_instruction_describe3":["field_696dcc80bdf78"],"instruction_describe4":[""],"_instruction_describe4":["field_696dcc84bdf79"],"material":[""],"_material":["field_696ef00c51c49"],"material_description":[""],"_material_description":["field_696ef01751c4a"],"pre_and_post_sales_titles":[""],"_pre_and_post_sales_titles":["field_696ef01e51c4b"],"after_sales_service_title":[""],"_after_sales_service_title":["field_696ef02551c4c"],"before_sales_service_title":[""],"_before_sales_service_title":["field_696ef02d51c4d"],"after_sales_service_describe":[""],"_after_sales_service_describe":["field_696ef03451c4e"],"before_sales_service_describe":[""],"_before_sales_service_describe":["field_696ef03b51c4f"],"faq_question1":[""],"_faq_question1":["field_696deea91804e"],"faq_question2":[""],"_faq_question2":["field_696deeb51804f"],"faq_question3":[""],"_faq_question3":["field_696deeb918050"],"faq_question4":[""],"_faq_question4":["field_696deebc18051"],"faq_question5":[""],"_faq_question5":["field_696deebf18052"],"faq_question6":[""],"_faq_question6":["field_696deec218053"],"faq_answer1":[""],"_faq_answer1":["field_696deec618054"],"faq_answer2":[""],"_faq_answer2":["field_696deece18055"],"faq_answer3":[""],"_faq_answer3":["field_696deed218056"],"faq_answer4":[""],"_faq_answer4":["field_696deed518057"],"faq_answer5":[""],"_faq_answer5":["field_696deeda18058"],"faq_answer6":[""],"_faq_answer6":["field_696deede18059"],"aggregated_titles":[""],"_aggregated_titles":["field_698ad8fabfec6"],"aggregate_description":[""],"_aggregate_description":["field_698ad913bfec7"],"polymer_product_sku1":[""],"_polymer_product_sku1":["field_698ad932bfec8"],"polymer_product_sku2":[""],"_polymer_product_sku2":["field_698ad93dbfec9"],"polymer_product_sku3":[""],"_polymer_product_sku3":["field_698ad941bfeca"],"aggregated_product_titles1":[""],"_aggregated_product_titles1":["field_698ad945bfecb"],"aggregated_product_titles2":[""],"_aggregated_product_titles2":["field_698ad94dbfecc"],"aggregated_product_titles3":[""],"_aggregated_product_titles3":["field_698ad954bfecd"],"aggregated_product_description1":[""],"_aggregated_product_description1":["field_698ad957bfece"],"aggregated_product_description2":[""],"_aggregated_product_description2":["field_698ad961bfecf"],"aggregated_product_description3":[""],"_aggregated_product_description3":["field_698ad965bfed0"],"polymerization_characteristics_tittle":[""],"_polymerization_characteristics_tittle":["field_699d3c712ad62"],"polymerization_characteristics1":[""],"_polymerization_characteristics1":["field_699d3c742ad63"],"polymerization_characteristics2":[""],"_polymerization_characteristics2":["field_699d3c7d2ad64"],"polymerization_characteristics3":[""],"_polymerization_characteristics3":["field_699d3c802ad65"],"polymerization_characteristics4":[""],"_polymerization_characteristics4":["field_699d3c842ad66"],"polymerization_characteristics5":[""],"_polymerization_characteristics5":["field_699d3c8d2ad67"],"polymerization_characteristics6":[""],"_polymerization_characteristics6":["field_699d3c902ad68"],"polymerization_characteristics_descr1":[""],"_polymerization_characteristics_descr1":["field_699d3c9a2ad69"],"polymerization_characteristics_descr2":[""],"_polymerization_characteristics_descr2":["field_699d3c9c2ad6a"],"polymerization_characteristics_descr3":[""],"_polymerization_characteristics_descr3":["field_699d3c9f2ad6b"],"polymerization_characteristics_descr4":[""],"_polymerization_characteristics_descr4":["field_699d3ca22ad6c"],"polymerization_characteristics_descr5":[""],"_polymerization_characteristics_descr5":["field_699d3ca52ad6d"],"polymerization_characteristics_descr6":[""],"_polymerization_characteristics_descr6":["field_699d3ca92ad6e"],"aggregated_application_scenarios_tittle":[""],"_aggregated_application_scenarios_tittle":["field_699d3cae2ad6f"],"aggregated_application_scenarios1":[""],"_aggregated_application_scenarios1":["field_699d3cbd2ad70"],"aggregated_application_scenarios2":[""],"_aggregated_application_scenarios2":["field_699d3cc52ad71"],"aggregated_application_scenarios3":[""],"_aggregated_application_scenarios3":["field_699d3cc92ad72"],"aggregated_application_scenarios4":[""],"_aggregated_application_scenarios4":["field_699d3ccc2ad73"],"aggregated_application_scenarios5":[""],"_aggregated_application_scenarios5":["field_699d3cd02ad74"],"aggregated_application_scenarios6":[""],"_aggregated_application_scenarios6":["field_699d3cd42ad75"],"aggregated_application_scenarios7":[""],"_aggregated_application_scenarios7":["field_69a29f5908336"],"aggregated_application_scenarios8":[""],"_aggregated_application_scenarios8":["field_69a29f5d08337"],"aggregated_application_scenarios9":[""],"_aggregated_application_scenarios9":["field_69a29f6208338"],"aggregated_application_scenarios10":[""],"_aggregated_application_scenarios10":["field_69a29f6708339"],"themepark_seo_title":["Fabricated Steel Structures: Proven Fabrication Methods"],"themepark_seo_description":["Master Proven Methods For Fabricated Steel Structures. Learn Top Qa\/Qc Tips For The Fabrication Of Steel Structures."],"themepark_seo_keyword":["Fabricated Steel Structure ,Fabricated Steel Structures ,Fabrication Of Steel Structures"],"catce":["sidebar-widgets4"],"views":["11"]},"acf":[],"medium_url":"https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16-300x169.jpg","thumbnail_url":"https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16-150x150.jpg","full_url":"https:\/\/www.wedospace.com\/wp-content\/uploads\/2026\/06\/image-1-16.jpg","_links":{"self":[{"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/posts\/14450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/comments?post=14450"}],"version-history":[{"count":1,"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/posts\/14450\/revisions"}],"predecessor-version":[{"id":14451,"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/posts\/14450\/revisions\/14451"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/media\/14438"}],"wp:attachment":[{"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/media?parent=14450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/categories?post=14450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wedospace.com\/fr\/wp-json\/wp\/v2\/tags?post=14450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}