...

Custom Steel Structure Construction Best Value Supplier

The GAOERJI has its own factory and design team to provide one-stop customized steel structure construction solutions from structural design, precision machining to on-site guidance, eliminating intermediate links to ensure that you get high-quality buildings at the most competitive ex-factory prices.

3 tons per square meter Maximum load capacity
60 meters Maximum single span length
less than March Standard installation time
more than 50 years Building structure life
345 MPa Steel tensile strength
hot-dip galvanizing treatment Anti-corrosion surface treatment
Custom Steel Structure Construction
gear

The three-dimensional modeling software is used for mechanical simulation to control the structural stress error within 2%, to ensure the overall stability of the building under extreme wind load and snow load, and to avoid the safety hazards caused by the deviation of traditional architectural design.

gear

All structural parts have been hot-dip galvanized at 850 degrees, and the thickness of the galvanized layer is 85 microns. In the coastal high humidity environment, it can achieve zero corrosion for 30 years, greatly reducing the maintenance cost of subsequent buildings.

gear

All steel components are CNC cut and automatically welded in the factory, and the qualified rate of welding in the factory reaches 99%. Only high-strength bolt connection is required on site, which shortens the construction and installation cycle by 40% and greatly reduces labor costs.

gear

Using computer-aided design to optimize the connection of nodes, the frame structure has excellent ductility, meets the nine-level seismic fortification standard, ensures that the building skeleton does not collapse in sudden geological disasters, and ensures the safety of internal personnel and assets.

gear

The interior of the building adopts a large-span column grid layout, which has no column interference and improves the space utilization rate 30%, meets the arrangement requirements of heavy machinery installation and large-scale production lines, and supports rapid expansion according to business growth.

gear

The GAOERJI is equipped with a professional overseas installation team of 20 people to provide on-site technical guidance and progress supervision to ensure that the installation process is fully in line with the drawings and specifications, and that the project can be delivered on schedule even in inexperienced areas.

Parameter ItemsSpecifications and Standards
Main materialQ355B low-alloy high-strength structural steel
Building spanAdjustable from 12 meters to 60 meters
Painting StandardsIndustrial grade epoxy zinc-rich primer and topcoat
Wall Covering0.5 mm thick colored corrugated steel sheet
Wind load180 km/h
Fire resistance ratingClass I fire protection design

With the whole industry chain manufacturing mode, GAOERJI show high flexibility and reliability compared with traditional foundries. Through strict industrial quality control, we ensure the dimensional accuracy of each 1 steel beam, thus solving the structural installation alignment difficulties in the project, greatly improving the on-site construction efficiency and reducing the secondary cutting and rework costs caused by component errors. In dealing with complex and harsh environments, the GAOERJI of customized processing technology effectively solves the problems of serious corrosion and short structural life of ordinary steel structures in hot and humid or acid-base corrosive environments. Through the use of high-grade galvanized anti-corrosion technology and special stress calculation, we not only extend the service life of the building as a whole, but also solve the industry problem of large-span factory buildings prone to roof deflection deformation through accurate mechanical analysis, so as to ensure the safety and stability of the space.

Custom Steel Structure Construction
solution

To solve the problem of uncontrollable construction progress

traditional construction projects often lead to repeated adjustment on site due to insufficient processing accuracy of components, thus delaying the construction period. The GAOERJI adopts factory-based numerical control precision prefabrication, shortening the installation cycle of the main structure by 40%, ensuring that your project can be completed in strict accordance with the scheduled plan.

solution

Solve the hidden danger of corrosion in extreme environments

ordinary steel structures are prone to oxidation and corrosion in humid or high-salt areas, reducing the safety level of buildings. We use the industry’s top hot-dip galvanizing process to keep steel components corrosion-free for more than 30 years in harsh environments, completely eliminating your worries about subsequent building maintenance costs.

solution

Solve the pain point of large-span space carrying stability

in view of the demand for large space in warehouses and production workshops, traditional structures are prone to structural downwardation or uneven forces. Relying on professional mechanical simulation calculation, the GAOERJI ensures that the large-span building is still firm and stable under heavy load conditions by optimizing the connection points of column net and beam frame, and solves the industry problem that it is difficult to balance space utilization and safe bearing.

responsible person of industrial manufacturing enterprises

Manufacturing decision makers who plan to expand a large production line or a heavy warehouse. We provide customized column network design to ensure that the plant meets the installation requirements of automation equipment, and at the same time provide rapid construction solutions to help enterprises achieve rapid production.

Custom steel structure construction applicable groups

General Contractor of Overseas Projects

Construction manager for overseas infrastructure and large commercial projects. The GAOERJI provides component production and export services in line with international standards, and sends overseas teams to guide the installation and solve the difficulties of project implementation.

Custom steel structure construction applicable groups

commercial real estate developers

Developers who need to build large logistics transfer centers or commercial exhibition spaces. Through our light steel structure system, we can reduce our own weight under the premise of ensuring safety, greatly reduce the cost of foundation treatment and shorten the overall development period.

Custom steel structure construction applicable groups

municipal infrastructure engineering units

Construction party involving bridge engineering or public transportation supporting facilities. We provide high-strength steel processing and strict quality inspection reports to ensure that all types of public buildings meet the most stringent building safety regulations and use standards.

Custom steel structure construction applicable groups
011

Before installation, it is necessary to check the coordinates of the embedded parts of the foundation, and use the theodolite to measure the level height difference to ensure that the error does not exceed 3mm, which lays the foundation for the accurate alignment of the subsequent main structure.

022

When hoisting steel columns, special lifting tools shall be used, and the hoisting angle shall be strictly controlled. During hoisting, the verticality of the components shall be maintained by the cable wind rope to ensure that the connecting holes are completely coincident with the anchor bolts.

033

All node connections must use a torque wrench, according to the initial tightening and final tightening two processes, the tightening value must meet the design requirements, to prevent the loosening of bolts resulting in uneven stress on the overall structure.

044

The coating damage caused by welding parts and lifting process shall be polished after installation, and anti-rust paint and topcoat shall be painted twice to ensure the consistency of overall anti-corrosion performance.

certificate

factory

Welcome to our Frequently Asked Questions page. We have compiled answers to common questions you may have, hoping to provide you with clear and quick solutions. If you cannot find the information you need here, please feel free to contact our customer support team.

What is the service life of steel structures produced by GAOERJI?
Under the correct maintenance conditions, the design service life can reach more than fifty years, and the hot-dip galvanizing treatment can effectively resist environmental corrosion.
Do you provide overseas site installation guidance?
Yes, the GAOERJI has a professional overseas guidance team of more than 20 people, which can provide the whole process installation training, technical supervision and on-site progress control services.
Can customized steel structures be produced according to special design drawings?
Totally, we have more than 30 engineers who can carry out secondary deepening design according to your drawings to ensure that the production accuracy meets the requirements of various complex structures.
How to ensure the seismic grade of steel structure buildings?
We will perform seismic calculations for the location of the building to ensure that the building complies with local seismic fortification codes by optimizing the design of structural joints and rigid connections.
How long does it take to ship the order?
Usually after design confirmation, the production processing cycle is four to eight weeks, depending on the size and complexity of the project, and we will ensure that the delivery is in accordance with the contract period.
How to control the quality of steel raw materials?
We only purchase high-quality raw materials from large steel mills, and each batch is strictly sampled to ensure that the material list and mechanical performance indicators are fully in line with national standards.
E-mail*
Number*
Country
Name
Your Question
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

Custom Steel Structure Construction Best Value Supplier

The GAOERJI has its own factory and design team to provide one-stop customized steel structure construction solutions from structural design, precision machining to on-site guidance, eliminating intermediate links to ensure that you get high-quality buildings at the most competitive ex-factory prices.

Custom Steel Structure Construction

gear

The three-dimensional modeling software is used for mechanical simulation to control the structural stress error within 2%, to ensure the overall stability of the building under extreme wind load and snow load, and to avoid the safety hazards caused by the deviation of traditional architectural design.

gear

All structural parts have been hot-dip galvanized at 850 degrees, and the thickness of the galvanized layer is 85 microns. In the coastal high humidity environment, it can achieve zero corrosion for 30 years, greatly reducing the maintenance cost of subsequent buildings.

gear

All steel components are CNC cut and automatically welded in the factory, and the qualified rate of welding in the factory reaches 99%. Only high-strength bolt connection is required on site, which shortens the construction and installation cycle by 40% and greatly reduces labor costs.

gear

Using computer-aided design to optimize the connection of nodes, the frame structure has excellent ductility, meets the nine-level seismic fortification standard, ensures that the building skeleton does not collapse in sudden geological disasters, and ensures the safety of internal personnel and assets.

gear

The interior of the building adopts a large-span column grid layout, which has no column interference and improves the space utilization rate 30%, meets the arrangement requirements of heavy machinery installation and large-scale production lines, and supports rapid expansion according to business growth.

gear

The GAOERJI is equipped with a professional overseas installation team of 20 people to provide on-site technical guidance and progress supervision to ensure that the installation process is fully in line with the drawings and specifications, and that the project can be delivered on schedule even in inexperienced areas.

Parameter ItemsSpecifications and Standards
Main materialQ355B low-alloy high-strength structural steel
Building spanAdjustable from 12 meters to 60 meters
Painting StandardsIndustrial grade epoxy zinc-rich primer and topcoat
Wall Covering0.5 mm thick colored corrugated steel sheet
Wind load180 km/h
Fire resistance ratingClass I fire protection design

Custom steel structure construction comparison points

Custom Steel Structure Construction
solution
To solve the problem of uncontrollable construction progress

traditional construction projects often lead to repeated adjustment on site due to insufficient processing accuracy of components, thus delaying the construction period. The GAOERJI adopts factory-based numerical control precision prefabrication, shortening the installation cycle of the main structure by 40%, ensuring that your project can be completed in strict accordance with the scheduled plan.

solution
Solve the hidden danger of corrosion in extreme environments

ordinary steel structures are prone to oxidation and corrosion in humid or high-salt areas, reducing the safety level of buildings. We use the industry’s top hot-dip galvanizing process to keep steel components corrosion-free for more than 30 years in harsh environments, completely eliminating your worries about subsequent building maintenance costs.

solution
Solve the pain point of large-span space carrying stability

in view of the demand for large space in warehouses and production workshops, traditional structures are prone to structural downwardation or uneven forces. Relying on professional mechanical simulation calculation, the GAOERJI ensures that the large-span building is still firm and stable under heavy load conditions by optimizing the connection points of column net and beam frame, and solves the industry problem that it is difficult to balance space utilization and safe bearing.

responsible person of industrial manufacturing enterprises

Manufacturing decision makers who plan to expand a large production line or a heavy warehouse. We provide customized column network design to ensure that the plant meets the installation requirements of automation equipment, and at the same time provide rapid construction solutions to help enterprises achieve rapid production.

Custom steel structure construction applicable groups

General Contractor of Overseas Projects

Construction manager for overseas infrastructure and large commercial projects. The GAOERJI provides component production and export services in line with international standards, and sends overseas teams to guide the installation and solve the difficulties of project implementation.

Custom steel structure construction applicable groups

commercial real estate developers

Developers who need to build large logistics transfer centers or commercial exhibition spaces. Through our light steel structure system, we can reduce our own weight under the premise of ensuring safety, greatly reduce the cost of foundation treatment and shorten the overall development period.

Custom steel structure construction applicable groups

municipal infrastructure engineering units

Construction party involving bridge engineering or public transportation supporting facilities. We provide high-strength steel processing and strict quality inspection reports to ensure that all types of public buildings meet the most stringent building safety regulations and use standards.

Custom steel structure construction applicable groups
011

Before installation, it is necessary to check the coordinates of the embedded parts of the foundation, and use the theodolite to measure the level height difference to ensure that the error does not exceed 3mm, which lays the foundation for the accurate alignment of the subsequent main structure.

022

When hoisting steel columns, special lifting tools shall be used, and the hoisting angle shall be strictly controlled. During hoisting, the verticality of the components shall be maintained by the cable wind rope to ensure that the connecting holes are completely coincident with the anchor bolts.

033

All node connections must use a torque wrench, according to the initial tightening and final tightening two processes, the tightening value must meet the design requirements, to prevent the loosening of bolts resulting in uneven stress on the overall structure.

044

The coating damage caused by welding parts and lifting process shall be polished after installation, and anti-rust paint and topcoat shall be painted twice to ensure the consistency of overall anti-corrosion performance.

Know Us and Contact Us

*
*
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

FAQ

What is the service life of steel structures produced by GAOERJI?
Under the correct maintenance conditions, the design service life can reach more than fifty years, and the hot-dip galvanizing treatment can effectively resist environmental corrosion.
Do you provide overseas site installation guidance?
Yes, the GAOERJI has a professional overseas guidance team of more than 20 people, which can provide the whole process installation training, technical supervision and on-site progress control services.
Can customized steel structures be produced according to special design drawings?
Totally, we have more than 30 engineers who can carry out secondary deepening design according to your drawings to ensure that the production accuracy meets the requirements of various complex structures.
How to ensure the seismic grade of steel structure buildings?
We will perform seismic calculations for the location of the building to ensure that the building complies with local seismic fortification codes by optimizing the design of structural joints and rigid connections.
How long does it take to ship the order?
Usually after design confirmation, the production processing cycle is four to eight weeks, depending on the size and complexity of the project, and we will ensure that the delivery is in accordance with the contract period.
How to control the quality of steel raw materials?
We only purchase high-quality raw materials from large steel mills, and each batch is strictly sampled to ensure that the material list and mechanical performance indicators are fully in line with national standards.
certificate

Submit Your Review

All Reviews

Loading…

Call Us
Call Us
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.