Pre Engineered Steel Structure Economy Model Available

GAOERJI prefabricated steel structures are optimized by variable cross-section mechanics to provide excellent structural strength and super-large span space while reducing steel consumption by 30%. GAOERJI have established a complete closed-loop production line from design to manufacturing. As a source entity factory, we eliminate all middleman costs and directly provide you with superior ex-factory prices and more accurate delivery control.

Q355B high strength steel Material
up to 90 meters Span range
The main structure lasts over 50 years. Service life
site assembly shortened by 50% Construction time
hot dip zinc or zinc rich coating Surface treatment
9 degrees seismic fortification Seismic grade
16 strong typhoon Wind resistance
pre engineered steel structure

gear

professional software is used for mechanical modeling, and variable cross-section steel beams are used according to the force distribution. This refined design significantly reduces unnecessary steel consumption without reducing the safety factor, and saves about 30% of raw material costs for investors.

gear

through the high-strength rigid frame system, to achieve a maximum of 90 m net span design. This eliminates the restrictions of internal pillars on forklift paths and automated sorting lines, and increases the utilization of flat space in logistics warehouses by more than 25%.

gear

all cutting, punching and welding processes are done in the factory, with tolerances within 1mm. There is no need for secondary processing on site, only high-strength bolts are required for assembly, which shortens the construction period of the 10,000 square meter project by 50% compared with traditional buildings.

gear

The vertical edge bite roof system is adopted to avoid the traditional punching and fixing method. This sealing structure solves the industry pain point of water seepage in large industrial plants, and ensures that precision equipment and inventory materials are always dry in high rainfall environment.

gear

The wall and roof system can be integrated with glass wool or polyurethane sandwich panels, combined with heat-breaking cold bridge technology. This can reduce the energy consumption of indoor air conditioning by about 40%, which greatly reduces the energy expenditure cost of industrial logistics center in the long-term operation.

gear

The PEB architecture allows lossless access to future business expansion. The reserved connection node enables the vertical extension or horizontal expansion of the warehouse without the need to stop work and rebuild, providing a high degree of flexibility for the investor’s asset appreciation.

Technical Indicator ClassificationStandard parameter descriptionReference Specifications
Main structure typeSteel pipe truss / Steel box girder / Space frameOptimization design based on span and load
Design load5.0 kN/m² (live load)Meets AASHTO / Eurocode standards
railing heightAvailable in 1.1m–1.4m lengths.Meets global pedestrian safety height requirements
Corrosion resistance lifespan30 years internal maintenance-free / 15 years external maintenance-freeISO 12944 C5 level
Maximum deflectionL/500 (span ratio)Ensure there is no vibration when pedestrians pass through.
Drainage systemConcealed internal drainage pipesTo prevent rainwater from directly eroding the bridge piers
Supporting systemsIntegrated LED lighting, tactile paving, and drainageProvides one-stop function integration

Third-party logistics companies (3PLs)

For carriers that need to quickly deploy large transit centers. GAOERJI Pre engineered steel structure shortens the cycle from land acquisition to operation and solves the problem of loss of market opportunities due to slow construction.

pre engineered steel structure Erythritol Applicable Scenarios

Manufacturing business owners

for factories that need to expand production lines and install large cranes. The flexibility of the PEB structure addresses the need for lifting space for heavy equipment, while reducing the initial investment pressure on fixed assets through customized design.

pre engineered steel structure Erythritol Applicable Scenarios

Cross-border e-commerce park investors

for investors who pursue high volume ratio and high standard storage environment. Our column-free design solves the problem of tight shelf arrangement and waste of space, and significantly improves the rental income potential per unit area.

pre engineered steel structure Erythritol Applicable Scenarios

Import and export trade bonded area builders

for the need to build a warehouse in line with international regulatory standards of the project side. GAOERJI offer solutions that meet stringent fire and structural safety standards, helping customers pass a variety of industry compliance reviews.

pre engineered steel structure Erythritol Applicable Scenarios
pre engineered steel structure raw material/material

pre engineered steel structure raw material/material

pre engineered steel structure raw material/material

pre engineered steel structure raw material/material

The raw materials of Pre engineered steel structure selected by the GAOERJI are all Q355B low-alloy high-strength steel from large steel mills such as Baosteel or Shougang to ensure the consistency of components. The enclosure material is made of 55% aluminum-zinc alloy coated steel plate with A- grade fireproof rock wool core material. The fastener system is uniformly configured with grade 10.9 high-strength torsional shear bolts to ensure that the nodes do not loosen under extreme loads.

pre engineered steel structure life and after-sales service

attention

Pre-sales and after-sales service

pre-sales to provide customized 3D deepening design and budget optimization services; after-sales stage, we provide each component with traceability code and up to 10 years of structural warranty. Commitment to 24-hour technical support, and provide a full set of assembly guide atlas at the project site.

attention

Product life and description

the main structure of this product design service life of not less than 50 years. It is recommended to inspect the connections of the enclosure system every 3 years. Due to the use of high-quality anti-corrosion paint, the first overhaul period can be extended to more than 15 years under normal atmospheric conditions.

certificate

factory

Welcome to our Frequently Asked Questions page. We have compiled answers to common questions you may have, hoping to provide you with clear and quick solutions. If you cannot find the information you need here, please feel free to contact our customer support team.

Q: Is Pre engineered steel structure cheaper than traditional steel structure?
A: Yes. Because PEB adopts variable cross-section optimization design, it can reduce the steel consumption by 15% to 30%, and the factory prefabrication reduces the on-site labor, the overall cost is usually more core competitiveness.
Q: Can the warehouse install cranes or solar panels?
A: Totally. In the design phase, we will include the weight of the crane, the dynamic load and the weight of the roof photovoltaic system into the model to ensure that the structure has sufficient bearing redundancy.
Q: Is it easy if I need to move or demolish the building?
A: The PEB system is fully bolted. This means that the building can achieve up to 90% recycling of components, support the overall demolition and off-site reconstruction, high asset preservation rate.
Q: Can this structure adapt to the building codes of different countries?
A: We can implement different standards according to the project location, including American AISC, British BS and Australian standards, to ensure that the drawings can smoothly pass the construction approval of the local government.
Q: How to ensure the fire safety of this large-area steel building?
E-mail*
Number
Country
Name
Your Question
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!

Pre Engineered Steel Structure Economy Model Available

GAOERJI prefabricated steel structures are optimized by variable cross-section mechanics to provide excellent structural strength and super-large span space while reducing steel consumption by 30%. GAOERJI have established a complete closed-loop production line from design to manufacturing. As a source entity factory, we eliminate all middleman costs and directly provide you with superior ex-factory prices and more accurate delivery control.

pre engineered steel structure

gear

professional software is used for mechanical modeling, and variable cross-section steel beams are used according to the force distribution. This refined design significantly reduces unnecessary steel consumption without reducing the safety factor, and saves about 30% of raw material costs for investors.

gear

through the high-strength rigid frame system, to achieve a maximum of 90 m net span design. This eliminates the restrictions of internal pillars on forklift paths and automated sorting lines, and increases the utilization of flat space in logistics warehouses by more than 25%.

gear

all cutting, punching and welding processes are done in the factory, with tolerances within 1mm. There is no need for secondary processing on site, only high-strength bolts are required for assembly, which shortens the construction period of the 10,000 square meter project by 50% compared with traditional buildings.

gear

The vertical edge bite roof system is adopted to avoid the traditional punching and fixing method. This sealing structure solves the industry pain point of water seepage in large industrial plants, and ensures that precision equipment and inventory materials are always dry in high rainfall environment.

gear

The wall and roof system can be integrated with glass wool or polyurethane sandwich panels, combined with heat-breaking cold bridge technology. This can reduce the energy consumption of indoor air conditioning by about 40%, which greatly reduces the energy expenditure cost of industrial logistics center in the long-term operation.

gear

The PEB architecture allows lossless access to future business expansion. The reserved connection node enables the vertical extension or horizontal expansion of the warehouse without the need to stop work and rebuild, providing a high degree of flexibility for the investor’s asset appreciation.

Technical Indicator ClassificationStandard parameter descriptionReference Specifications
Main structure typeSteel pipe truss / Steel box girder / Space frameOptimization design based on span and load
Design load5.0 kN/m² (live load)Meets AASHTO / Eurocode standards
railing heightAvailable in 1.1m–1.4m lengths.Meets global pedestrian safety height requirements
Corrosion resistance lifespan30 years internal maintenance-free / 15 years external maintenance-freeISO 12944 C5 level
Maximum deflectionL/500 (span ratio)Ensure there is no vibration when pedestrians pass through.
Drainage systemConcealed internal drainage pipesTo prevent rainwater from directly eroding the bridge piers
Supporting systemsIntegrated LED lighting, tactile paving, and drainageProvides one-stop function integration

Third-party logistics companies (3PLs)

For carriers that need to quickly deploy large transit centers. GAOERJI Pre engineered steel structure shortens the cycle from land acquisition to operation and solves the problem of loss of market opportunities due to slow construction.

pre engineered steel structure Erythritol Applicable Scenarios

Manufacturing business owners

for factories that need to expand production lines and install large cranes. The flexibility of the PEB structure addresses the need for lifting space for heavy equipment, while reducing the initial investment pressure on fixed assets through customized design.

pre engineered steel structure Erythritol Applicable Scenarios

Cross-border e-commerce park investors

for investors who pursue high volume ratio and high standard storage environment. Our column-free design solves the problem of tight shelf arrangement and waste of space, and significantly improves the rental income potential per unit area.

pre engineered steel structure Erythritol Applicable Scenarios

Import and export trade bonded area builders

for the need to build a warehouse in line with international regulatory standards of the project side. GAOERJI offer solutions that meet stringent fire and structural safety standards, helping customers pass a variety of industry compliance reviews.

pre engineered steel structure Erythritol Applicable Scenarios

pre engineered steel structure raw material/material

The raw materials of Pre engineered steel structure selected by the GAOERJI are all Q355B low-alloy high-strength steel from large steel mills such as Baosteel or Shougang to ensure the consistency of components. The enclosure material is made of 55% aluminum-zinc alloy coated steel plate with A- grade fireproof rock wool core material. The fastener system is uniformly configured with grade 10.9 high-strength torsional shear bolts to ensure that the nodes do not loosen under extreme loads.
pre engineered steel structure raw material/material

pre engineered steel structure raw material/material

pre engineered steel structure raw material/material

pre engineered steel structure life and after-sales service

attention

Pre-sales and after-sales service

attention

Product life and description

Know Us and Contact Us

*
Submitting!
Success!
Submission failed! Please try again later!
Email format error!
Format error!
FAQ

FAQ

Q: Is Pre engineered steel structure cheaper than traditional steel structure?
A: Yes. Because PEB adopts variable cross-section optimization design, it can reduce the steel consumption by 15% to 30%, and the factory prefabrication reduces the on-site labor, the overall cost is usually more core competitiveness.
Q: Can the warehouse install cranes or solar panels?
A: Totally. In the design phase, we will include the weight of the crane, the dynamic load and the weight of the roof photovoltaic system into the model to ensure that the structure has sufficient bearing redundancy.
Q: Is it easy if I need to move or demolish the building?
A: The PEB system is fully bolted. This means that the building can achieve up to 90% recycling of components, support the overall demolition and off-site reconstruction, high asset preservation rate.
Q: Can this structure adapt to the building codes of different countries?
A: We can implement different standards according to the project location, including American AISC, British BS and Australian standards, to ensure that the drawings can smoothly pass the construction approval of the local government.
Q: How to ensure the fire safety of this large-area steel building?
certificate

Submit Your Review

All Reviews

Loading…

Call Us
Call Us